My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
INSTALL_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 4:22:05 PM
Creation date
11/8/2018 9:53:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2006
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\116\PR0523684\INSTALL 2006.PDF
QuestysFileName
INSTALL 2006
QuestysRecordDate
4/24/2018 10:24:48 PM
QuestysRecordID
3865777
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUPERIOR BEARING COOLING <br /> Another industry first from FE Petro,Our VL2 The IST uses the <br /> pump model fits 94%of all tank diameter and exclusive FE Petro <br /> tank bury depth combinations.Our VLl&VL3 cooling system.This <br /> model lengths handle all others. unique system <br /> continually passes <br /> over 1 GPM through a <br /> fine bronze filter and <br /> directly through motor <br /> bearings whenever <br /> e� pump is operating. I a <br /> Pump length is set at the job site by making otic, simple. This systom has been designed to extend critical bearing <br /> measurement.and setting the pump length. All in about and motor life. <br /> 20 aditutes and without affecting the UL listing of the.pump. <br /> NIARUAI PRESSURE RELIEF <br /> VERTICAL DISCHARGE <br /> Another unique feature of FE Petro.Provides for a <br /> FE Petro is the only submersible simple connection to underground piping. <br /> on the market with manual <br /> pressure relief,regardless of the <br /> type of line leak detection you <br /> elect to use,mechanical or <br /> electronic. <br /> s� <br /> I <br /> Reducing line pressure to aero prior to servicing filters greatly <br /> reduces the possibility of fuelspraying into containment.sumps. .This unique FE Petro feature allows for fewer fittings to <br /> and onto service personnel. Improves safety, the envirgrmnent, connect the pump to the discharge line,and requires less <br /> and needless sump sensor alarms. space in the sump. <br /> B RELIABLE CHECK VALVE AIR ELIMINATOR <br /> Used for over 12 years, — The IST uses the <br /> this 2 3/4" (70mm) standard FE Petro air <br /> diameter check valve j . eliminator which <br /> reduces flow loss,has + . eliminates air through t <br /> greater sealing the highest point in the <br /> pressure at pump shut 10 pump head,regardless <br /> off,and is available t of the type of line leak <br /> with several pressure detector used. <br /> relief settings. <br /> Time tested proven performer helps gyve FE Petro greater flow �'�" � . <br /> rates and compatibility with all mechanical and electronic line " High point air elimination assures air does not pass into <br /> leak detection in use today. Variouspressure. relief settings discharge piping avoiding various issues related to air vn <br /> eliminate :the need for external check valves for line leak the piping system in the retail meter and leak detection <br /> detector compatibility. systems. <br />
The URL can be used to link to this page
Your browser does not support the video tag.