My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
INSTALL_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 4:22:05 PM
Creation date
11/8/2018 9:53:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2006
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\116\PR0523684\INSTALL 2006.PDF
QuestysFileName
INSTALL 2006
QuestysRecordDate
4/24/2018 10:24:48 PM
QuestysRecordID
3865777
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Healy Systems 900 Series I Nozzle • Page I of 2 <br /> t <br /> Healy Systems, InC, rhe lnnovaitiveleader ofStage/IVapor Recovery re <br /> pry, r " <br /> NO3vil � �LpRPt?IIAIE3'R4FlEEr J ;1ti}{r�lisxAP� i <br /> PRODUCT INFORMATION <br /> { ' , Healy Stage II Vapor Recovery Systems <br /> c 900 Series EVR <br /> ' Nozzle <br /> Enhanced Vapor Recot <br /> Certified <br /> ry � The most efficient and dt <br /> CALEB l: Y r � � gasoline nozzle on the m <br /> today. The 900 series bo <br /> Certified Stage II high quality, durability an <br /> Vapor Recovery of the art engineering de: <br /> to reduce emissions taut <br /> ,•--1 liquid retention and spilla <br /> associated with other Ste <br /> _ nozzles. The 900 series l <br /> WW <br /> r " meets all EVR and ORVI <br /> specifications required bi <br /> California Air Resources <br /> MORE <br /> (CARB). <br /> EVR /ORVR Certif <br /> (GARB) <br /> a Highest quality, mo <br /> efficient nozzle ava <br /> la Hampshire Onva a High reliability and <br /> Hust444,NH 020$1 maintenance <br /> 601-saz-2472 <br /> FaV603482.5189 <br /> a 2006 Haaly systarna,Inc GARB Certified for use with: Under GARB Executive O <br /> VR-201-A <br /> VP 1000 Series Vacuum Pump VR-202-A <br /> G-70-191-AA <br /> 11ttp://www.l)ealysystems.com/pages/900nazzle.huul 3/10/2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.