My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
INSTALL_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 4:22:05 PM
Creation date
11/8/2018 9:53:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2006
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\116\PR0523684\INSTALL 2006.PDF
QuestysFileName
INSTALL 2006
QuestysRecordDate
4/24/2018 10:24:48 PM
QuestysRecordID
3865777
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • Bulletin No. 62109 <br /> October 1, 2004 <br /> FberGlassSystems- SMITH FIBERCAST <br /> AYarao Company <br /> Sump Entry/Termination Fitting <br /> with Gasket <br /> 2. Place sump entry/termination let protector.Apply adhesive to <br /> fitting through hole with the the V4"fitting and screw into 1/4" <br /> threads on the inside of the sump threaded outlet.Tighten to <br /> wall. A maximum of 20 of offset 40 in.lbs.or 1V2-2 turns past <br /> is acceptable for a proper seal on hand tight. After installing fitting, <br /> a flat surface. For a rounded sur- be sure the interstitial space is <br /> face,no offset will be allowed; free from excess adhesive. Install <br /> pipe must be perpendicular to a short hose and blow excess <br /> 1. Determine entry hole location the sump. adhesive through air passage. <br /> and cut entry hole in sump wall 3. Locate V4"threaded outlet to the 7. Allow adhesive to cure before <br /> using dimensions in Table t. desired location.Leave V4"plas- bonding primary pipe,testing or <br /> tic threaded outlet protector in applying stress.See adhesive kit <br /> TABLE 1. Fitting Dimensions place until V4"fitting installation. instructions for ambient cure <br /> 4. Lube gasket with a water times. <br /> Size A B C based lubricant and place over 8. The use of an industrial hot air <br /> the threads and against the sump gun may speed up the curing <br /> (in.) (in.) (in.) (in) wall, process. Do not overheat. <br /> 3x2 6.83 4.00 4.00 5. Thread nut onto fitting hand 9. Connect only flexible tubing or <br /> 43 6.83 4.00 5.00 tight. Do not tighten until sys- hoses to the V4"side-outlet. <br /> tem completion. Note:tubing or hoses must be <br /> 6. Remove 1/4"plastic threaded out- rated to full vacuum. <br /> Entryfrermination Fitting Body <br /> Sump Wall <br /> Gasket <br /> Nut <br /> fit <br /> t T <br /> v <br /> Hole Dia. <br /> —_ ___—_ <br /> LB — <br /> URL <br /> hop:/tw .smithfbecast.com F113ER GLASS SYSTEMS•SMITH FIBERCAST DIVISION•A VARCO COMPANY <br /> 2700 W.65TH ST.,LITTLE ROCK,AR 72209-8592•Phone 501-568-4010•Fax 501-568-4465 <br /> 25 S.MAIN ST.,SAND SPRINGS,OK 74063-Phone 918-245-6651•Fax 918-248-7566 <br />
The URL can be used to link to this page
Your browser does not support the video tag.