My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
INSTALL_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 4:22:05 PM
Creation date
11/8/2018 9:53:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2006
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\116\PR0523684\INSTALL 2006.PDF
QuestysFileName
INSTALL 2006
QuestysRecordDate
4/24/2018 10:24:48 PM
QuestysRecordID
3865777
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File MH17921 Vo . 1 Sec, 2 ILL-7 Issued:1998-01-27 <br /> Aril Report <br /> MAMIFAuTURING PROCESS(DOUBLE-WALL DISPENSER SUMPS) <br /> Stop 1). (prepare slug and end capmoldsfor part. <br /> Slap Z). Apply fust spray up layer approx. 1/8 in,thick. <br /> Step 1). (Roll oul all air bubbles in first spray up layer. <br /> Step 4)- Apply second spray up layer to achieve part thickness of 3116 in,200 <br /> mils.nominal <br /> Step 5). ;Rall out all air bubbles end smootb spray up surnwe. <br /> Step 6). iTnspai l part 1'or correct part thickness and correct roll out procedure, <br /> Step 7), Yvspact during cure cycle for}rim ptucedura.. <br /> Step 8). 11-tim parts to mold edges.. <br /> Step 9). !Paris 0011dwe cure cycle on mold, <br /> Step 10). IRamode parts from mold. <br /> step 11), !Weigh part,inspect for thiekneaeconsisteacy,air bubbWs, deiaminations <br /> for any defects. <br /> Step 12), Cut slug to comet length ibr dispenser model. <br /> Step 13). !Assemble end•capa and-1vS with sctuwx. . <br /> Step 14). (laminate end-cups to slug with two layers oftnnt and catalyzed rosin.Let <br /> cute. <br /> Stcp 15), Br mk glfends of screws intruding into sump. <br /> Step 16). Sand outer outface of dispeosor mmnp.Well out and apply layer of <br /> P'araboam cloth(or equivalent). Let core. <br /> Step 17), Sand suri'aca ofrarabeam cloth(or equivalent). Apply layers of chopped <br /> strand mat to achlcvo part thickness ofouter wall of 3/16 im,200 mile. <br /> ).et sue. . <br /> Step 18). !Crim excess nitteriat firm edges of dispenser amp. <br /> Step 19), flow-aoar nuhr surtbce avd exp9aed edges of sump with waxed resin. <br /> 0040040695 <br /> 40 39dd SSV-19J09I3 Nb3193M 940Z-EFS-L01 ET:SS b00Z/2Z/90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.