My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
INSTALL_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 4:22:05 PM
Creation date
11/8/2018 9:53:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2006
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\116\PR0523684\INSTALL 2006.PDF
QuestysFileName
INSTALL 2006
QuestysRecordDate
4/24/2018 10:24:48 PM
QuestysRecordID
3865777
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
x'i1e MH17921, Sec. 2 ILL-7 Issued:1998-01-27 <br /> Ano Report <br /> MANUFA(�TURINO PROCESS(DOUDLir WALT.DISPENSER SUDS) <br /> Step 1). Prepare slug and end cap molds for part. <br /> Step 2). APPLY frrat spray up layer approx. 1!S in,duck. <br /> Step 3). Roll nut all air babbles is Fust splay up layer, <br /> (. Step 4)- Applyyocond spray up Inger to achieve part ihiclmem or 3116 in.,200 <br /> arils.mminel <br /> Step s). .Roll out all air bubble$And smooth spray.up aur&oe. <br /> Step 6). roypwl part lbr cort'ett part thickness and carrect roll out procedure. <br /> Step 7). Insped during cure cycle for trim procedure. <br /> Step 8). frim parts id mold edges. <br /> Step 9)., flans cowiluo cure cydc on mold.. . <br /> Step 10). Remo v patty flum mold- <br /> . Step 11). Weigh pan,insPect fofttdckncae ceoeisteacy,air bubbler,delamitutions <br /> .:,. oranydercet$. . <br /> Stop 12). Cut grog w correct(angor£or draPOnaer modej. . <br /> Step 13). As end,caps and Aug pith tcrawe. <br /> Step 14), .- Lamioam end-caps to'$lug with twe Isyets of matand eatalyxed ra$ir-Let <br /> :cure. . <br /> Step 15). j Dycak wrends of screws intruding into aump, <br /> . Step 16)- 'Saud omer aurfeoe of dispeow sump.W0t out sed apply layer of . <br /> IParabeam deih(ol equivalent). Let cure, <br /> . Step u).. �,Saad aurthce ol'PerabOatn c1at1) or a <br /> ped <br /> �htrand mat to achluwo part,thi Wass of oulerai dJ Apply <br /> 1116 in.;200 <br /> Let cure. <br /> Step 18)- 'Crim excess material from edges ofdiepanm swap, <br /> Scep 39). plow--cogs outer surtiux and exposed edges of sump with waxed tesla. <br /> 0040040695 <br /> ZT 3gt/d SSti-IDNzIEI 3 NN31S3M 9b9Z-EZ5-L9L CT :9T 009Z/ZZ/99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.