My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
INSTALL_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 4:22:05 PM
Creation date
11/8/2018 9:53:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2006
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\116\PR0523684\INSTALL 2006.PDF
QuestysFileName
INSTALL 2006
QuestysRecordDate
4/24/2018 10:24:48 PM
QuestysRecordID
3865777
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WESTERN FIBERGLASS, INC, 1-800-688-3375 <br /> FILAMENT WOUND SUMP RISER& REDUCERS—DOUBLEWALL <br /> Summary <br /> The Doublewall(DB W)Filament wound sump riser and riser reducer shall be installed onto the underground <br /> storage tank and in accordance with the manufacturers installation instructions.The DB W UST sump riser and <br /> riser reducer shall provide an open piping termination and inspection/service area that is non-permeable to <br /> hydrocarbons,compatible with all fuel blends,and will not hold a static electrical charge.The sump system shall <br /> provide for the monitoring of the sump body interstitial space and shall contain environmentally hazardous fluids <br /> that might teak from piping terminations,fittings and flex-hoses contained within the sump and additionally <br /> require no internal back-fill or bracing and be self supporting.The sump shall be manufactured by Western <br /> Fiberglass,Inc. <br /> System Specifications <br /> 1.01 System Suitability <br /> The DB W Tank Sump Riser'!fube and Riser Reducer Assembly shall: <br /> A• Attach to the UST manway,bung fitting or containment collar to prevent the intrusion of <br /> ground water into the sump assembly. <br /> B• Be of sufficient size to allow alls,m termination's,fitting <br /> be contained within the Sump Assembly. <br /> equipment and flex-hoses to <br /> C• Provide ample area to allow servicing and inspection of all piping termination's,fittings, <br /> equipment,and flex-hoses within the Sump Assembly. <br /> D. Contain any release of environmental contaminates from the tank fittings and equipment <br /> contained within the Sump assembly. <br /> E. Provide an interface to the access"street"manwa stem <br /> "lift-lid"tank Sum Riser T y with sealed water tight or friction <br /> FTube Reducer assembly. <br /> Be13e a Double wall,U.L.Listed device for pressure,vacuum or liquid monitoring of the <br /> interstice. <br /> 1.02 Construction Specifications <br /> A. Meet or exceed United States National Bureau of Standards PS 15-69 for Custom Contact- <br /> Molded Reinforced-Polyester Chemical-Resistant Process Equipment or U.L.Listing if <br /> applicable. <br /> B• 13C constructed ofmaterials that are not harmful to the environment. <br /> C. Be non-permeable to the hydrocarbons and not weakened by exposure to these materials. <br /> D. Be suitable for petroleum products and blends including g methanol and ethyl alcohol <br /> E. Have a thirty(30)year warman <br /> ty against corrosion. <br /> 1.03 Release Monitoring System shall: <br /> A. Allow full visual and physical access/inspection of all piping reductions,fittings. <br /> and equipment, os hoses, <br /> B. Provide a interstitial space monitoroint for <br /> P electric monitoring and evacuation of fluids. <br /> 1.04 Piping Penetrations <br /> A. Provide locations for the installations of fluid tight pipe and conduit penetration seals to <br /> be installed to manufacturer's instructions. <br /> 6Z 39Gd SSti_1920SId N831S3M 9602-CZ9-L0L CT:ST POOZ/ZZ/9O <br />
The URL can be used to link to this page
Your browser does not support the video tag.