My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
INSTALL_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 4:22:05 PM
Creation date
11/8/2018 9:53:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2006
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\116\PR0523684\INSTALL 2006.PDF
QuestysFileName
INSTALL 2006
QuestysRecordDate
4/24/2018 10:24:48 PM
QuestysRecordID
3865777
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> File M117921 Vo 1 Sec, 2 ILL-7 <br /> An Report Issued:1998-01-27 <br /> MANUFAdTUMG PR0CFSS(DOUBLE-WALL DTSPETSER SUMPS) <br /> Step 1). :Prepare slug and oral cap molds for part. <br /> Step 2). Apply fust spray up layer approx. I/8 in,tffick. <br /> Stop 3) .holt out all air bubbles in first spray up lsyor, <br /> Step 4). Apply second spray up layer to achieve part thielmom of 3116 in,200 <br /> MES. nominal, <br /> Step 5), ;Rol)m,t alt au bubbles and smooth spray up acrface. <br /> Step 6). I,Tnypeiyl part lot=rccL pan dlicknoss and correct roll out procedure. . <br /> Step 7), Inspect during cure cycle for trim procedure,. <br /> Step 8). iTdm pans to mold edges.. <br /> Step 9), parts condwe cure cydc on atold. <br /> Step 10). Remove parts from mold, . <br /> Step 11), !Weigh pan,inspect for thickness consistency,air bubble%,delaminatio:ta <br /> _ brenydefeMs. <br /> Stop 12), iCut slug to coffer leugt$1tr disponaer model, <br /> gasp13). Assemble end7wpsand sungwith screwe. . . <br /> . Step 14). Il.,amieare end-capsto slug with two layers of mat and catalyzed resit-Let <br /> loure. <br /> Step 15), �Brmk gf ends of screws irtrrtldiay into sump. <br /> Step 14j8and outer surface of dispenser sump.Wet out and apply layer of <br /> Parabeam cloth(or equivalem). Lei caro. <br /> Step 17), ¢and surface of"Parabeam cloth(or equivalent). Apply layers of chopped <br /> ptrsnd mat to acmeve pert thiekaass ofouter wall of 3116 in.,200 mile. <br /> J[.et cure- <br /> Stop <br /> Step 18). trim excess material Cram edges of dispenser sump. <br /> Step 19), plow-afar outer surface and exposed edges of sump with waxed resin, <br /> C040040695 <br /> I _ , <br /> b9 3eJtid SSV-19L1391A NN31S3M 9b9Z-EZ5-Z0/ b00Z/ZZ/92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.