My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
INSTALL_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 4:22:05 PM
Creation date
11/8/2018 9:53:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2006
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\116\PR0523684\INSTALL 2006.PDF
QuestysFileName
INSTALL 2006
QuestysRecordDate
4/24/2018 10:24:48 PM
QuestysRecordID
3865777
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File MH17921 <br /> Page T3-1 of 1 Issued; 1998-.01-27 <br /> New: 2004-04-12 <br /> TEST RECORb NO. 3 <br /> SAMPLES: <br /> The manufactur.r submitted Model DMA dispenser sump having outside <br /> dimensions of 39 in. long by 36 in. wide .by 31 in, high. The top Opening was <br /> 36-1/4 x 18 in. <br /> !. Due to the similarities to the single wall svmpp covered in this report, <br /> only the.f011oWing test was conducted, <br /> ANNULUS PROOF PRESSURE-TEST; <br /> METHOD <br /> The interstiti4l &,pace of the, sample Was subjected to an aerostatic <br /> pressure of 5 psig for a period of 24 hours. The pressure was then increased <br /> to 10 psig for a period of 1 minute, The pressure was then decreased to 5 <br /> psig, and holes were drilled in random locations on the sump wall tq cheek for <br /> communication. <br /> RESULTS <br /> The sump did not rupture Or leak. <br /> the sump. The pressure Communicated throughout <br /> Test Record Summary; <br /> The results of this investigation indicate that the product(s) <br /> comply with app"Cablp qevaluated <br /> reuirements, and therefore; . cts are judged <br /> such produ <br /> eligible to bear UL's, Mark as described on the Conclusion Page of this Report: <br /> .Test Record by; Reviewed by: <br /> TIM CREWS WAY= DOVERSBERGER <br /> Staff Engineer Staff Engineer <br /> I <br /> 60 3DVd SSV-19N3HI3 N2131S3M 9702-EZ5-L0L 61:91 790Z/ZZ/90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.