My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
INSTALL_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 4:22:05 PM
Creation date
11/8/2018 9:53:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2006
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\116\PR0523684\INSTALL 2006.PDF
QuestysFileName
INSTALL 2006
QuestysRecordDate
4/24/2018 10:24:48 PM
QuestysRecordID
3865777
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
File rnH17921 Vo 1 Sec, 2 ILL-7 <br /> An Report leaued:1998-01-27 <br /> MANUFAdTUM43 PROCESS (DUUBL r WALL DTSPLWSBR SUMPS) <br /> Stop 1). Prepare slug and sed cap molds for part. <br /> Step 2). 'apply frrp Spray up layer approx. 1/8 in,thick. <br /> Stap 3) IR011 dun all air bubbles ht first spray up Iayor, <br /> Step 4). Apply wcond spray up layer to achieve part thickness of 3116 in,200 <br /> mils.nomiuol. . <br /> Stop 5), ;Roll out all air bubbles end smoatb'spray up aurfaca. <br /> Step 6), irnypety pari for correct part dticknass and corroat roll out procedure. - <br /> Stcp 7), 7napecl during cure cycle for trim procedure.. ' <br /> .. .. Step 8), 11-rim pans to mold edges., . <br /> Step 91) Paris continue cure cycle ca mold. <br /> Step 10). [Remove parts from mold. . <br /> Step II}, Weigh part,ttupecefpr thiolcneeeconsistt:acy,air Wbbl%. delaminations <br /> brany defeats. . <br /> Step t 2), iOut slug to collect length for dispenser model <br /> step 13). !Assemble eed•aws aad arks with screws. <br /> . Step 14). It.amimata end-capsto slug with two layant ofmat nn4 catalyzed resin Lot <br /> lure. <br /> Stcp IS), freak elfrouds of screws inituWay into pump, <br /> Step16j. $and outer sutfaoeofdispccsoraunp.Wetout sadapplylayerof <br /> Parabedm doth(or equivnlenc). I,et cora. <br /> Step 17). Nand aurthce ofparabeam cloth(or equivalent). Apply layers urchopped <br /> ptrutd mat to"elders part thickness ofouter wall of 3/16 in,200 mile. <br /> cure. <br /> Step 18). Ttim excess material firm edges efdiepenser sump. <br /> Step 19). Flow-aoarnuter amtpcc and exposed edges&sump with waxed resin. . <br /> . C040040695 <br /> i <br /> VO 39tid SSti-19a3HId NJ31S3M 9792-EZ9-10L CT:91 499Z/ZZ/99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.