My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
INSTALL_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 4:22:05 PM
Creation date
11/8/2018 9:53:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2006
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\116\PR0523684\INSTALL 2006.PDF
QuestysFileName
INSTALL 2006
QuestysRecordDate
4/24/2018 10:24:48 PM
QuestysRecordID
3865777
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE MITIGATION: <br /> a. In the event contamination is observed, confirmed or suspected as a <br /> result of a leaking UST system it is the responsibility of the owner or <br /> operator to submit a work plan to EHD Site Mitigation Unit prior to <br /> initiating any assessment or remediation activities. <br /> b. To minimize delays, a Corrective Action Plan may be submitted <br /> concurrent with tank closure or installation plans. Address one copy of <br /> the Corrective Action Plan to the Site Mitigation Unit for review. For <br /> further assistance contact the Site Mitigation Unit at(209)468-3450. <br /> B. PLAN REVIEW AND OPERATING PERMIT FEES <br /> 1. New facility plan review fee of$744.00 (8 hour minimum per facility), $500.00 <br /> 44.6o facility fee(includes one tank), $125.00 per tank after the first tank,plus $10.00 <br /> Op state surcharge fee per tank is due at time of plan submittal plus $17.50 per site state <br /> j1fs, Oo surcharge. <br /> ?V 2. New installation of an additional tank at an existing facility is $744.00 plan review <br /> 710 '� fee(8 hour minimum per facility)plus $125.00 per new tank after first tank, and <br /> N� $10.00 per new tank state surcharge fee. <br /> It should be noted that a$744.00 plan review check fee required for each submittal <br /> �J allows for up to eight(8)hours of staff review and/or inspection time. Additional <br /> time spent on plan review, meetings, inspections,phone or office consultations will <br /> be billed to the applicant at a rate of$93.00 per hour. <br /> 4. The maximum review time for UST installation plans is 40 working days. A <br /> preliminary review will be conducted by the EHD within 20 working days of <br /> submittal date to identify any gross plan deficiencies. <br /> 5. If gross deficiencies are identified, the plans will be returned with a checklist <br /> identifying plan deficiencies. <br /> 6. To expedite the review of installation plans,time and a half per hour overtime fee <br /> may be submitted to have review completed within 10 working days of submittal <br /> date if staff is available to perform the review. <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> - 2 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.