My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
INSTALL_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 4:22:05 PM
Creation date
11/8/2018 9:53:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2006
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\116\PR0523684\INSTALL 2006.PDF
QuestysFileName
INSTALL 2006
QuestysRecordDate
4/24/2018 10:24:48 PM
QuestysRecordID
3865777
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> Preliminary Instructions ....................................................3 Wet Hole......................................................... 14 <br /> Safety Considerations.......................................................3 Bedding..................................................... 14 <br /> Reminders .....................................................................3 Ballast....................................................... 14 <br /> Activation of Tank Warranty................................................3 Backfill....................................................... 14 <br /> Important Telephone Numbers.........................................3 A9. Piping and Sump Clearances ....................... 15 <br /> Tank with Bottom Sumps ............................... 15 <br /> A All Single-wall and Double-Wall Tanks ...............4-15 Extemal Piping ............................................... 15 <br /> Al. Handling/Preparation........................................4 Internal Piping ................................................ 15 <br /> Lifting Tanks ......................................................4 A10. Filling.............................................................. 15 <br /> A2. Bed and Backfill ................................................4 A11. Venting............................................................ 15 <br /> A3. Pre-installation Testing .....................................5 Al2. Manway and Manway Extensions .................. 15 <br /> Pressure............................................................5 A13. Special Instructions for Compartment Tanks.. 16 <br /> Visual Air-Soap Test..........................................5 A14. Site Monitoring Wells ..................................... 16 <br /> Single-Wall Tanks.............................................5 B. Double-Wall Tank Monitoring Systems.................. 17 <br /> Double-Wall Tanks with Dry Annular Space......5 B1. Types of Tank Monitoring Systems ................ 17 <br /> Outer Wall Test.............................................6 82. Installation of Liquid or Vapor Sensor............ 17 <br /> Inner Wall Test .............................................6 B3. Installation of Vacuum or Air Pressure Monitoring <br /> Double-Wall Tanks Hydrostatically Monitored System............................................................ 17 <br /> Reservoir Level Check.................................6 B4. Installation of Hydrostatic Tank Monitor......... 17 <br /> Outer Wall Test.............................................6 C. Hydrostatic Monitoring ........................................... 18 <br /> Inner Wall Test .............................................6 Cl. Preparation..................................................... 18 <br /> A4. Hole Size ...........................................................7 C2. Jobsite Safety Precautions ............................ 18 <br /> Stable Excavations ............................................7 C3. Reservoir Fluid Height Adjustment................ 18 <br /> Unstable Excavation..........................................8 C4. Reservoir Alarm Actions................................. 18 <br /> A5. Burial Depth and Cover.....................................8 D. Collars and Turbine Enclosures........................19-23 <br /> ExcavationDepth...............................................8 D1. General........................................................... 19 <br /> Traffic Pad Reinforcement ................................8 Containment Collar........................................ 19 <br /> Pad Dimensions...............................................8 Turbine Enclosure.......................................... 19 <br /> Maximum Burial Depth......................................8 Handling......................................................... 19 <br /> A6. Filter Fabric Installation.....................................9 Inspection....................................................... 19 <br /> Dry Hole.............................................................9 D2. Turbine Enclosure Height.............................. 19 <br /> Wet Hole............................................................9 D3. Top Clearances.............................................. 20 <br /> AT Anchoring ....................................................9-12 D4. Mounting Turbine Enclosure to Collar........... 20 <br /> Mechanical Anchoring .................................... 10 D5. FRP Sealed Turbine Enclosure..................... 22 <br /> Concrete Anchor Pad ......................................11 D6. FRP Watertight Turbine Enclosure ................ 22 <br /> Deadman Anchors ..........................................11 D7. FRP Nonsealed Turbine Enclosure .............. 23 <br /> Single-Tank Installation .............................11 D8. Hydrostatic Water Test ................................... 23 <br /> Multiple-Tank Installation.......................... 12 Joints.............................................................. 23 <br /> Anchoring Hardware ...................................... 12 Seals .............................................................. 23 <br /> Optional Man-out-of-hole Method .................. 12 D9. Monitoring....................................................... 23 <br /> A8. Tank Installation ....................................................... 13 D10. Periodic Testing ............................................. 23 <br /> Dry Hole(with OSHA sloped excavation walls)13 E. Field-installed Fittings for Piping and Electrical <br /> Bedding..................................................... 13 <br /> Conduit .............................................................24.26 <br /> Backfill....................................................... 13 E1. FRP Coupling Installation.............................. 24 <br /> Dry Hole (straight or shored walls 13 E2. Secondary Piping Connection ....................... 25 <br /> Backfill....................................................... 13 E3. Electrical Coupling Installation ...................... 26 <br /> Probe......................................................... 13 F. Manway Risers........................................................ 27 <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.