My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
INSTALL_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 4:22:05 PM
Creation date
11/8/2018 9:53:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2006
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\116\PR0523684\INSTALL 2006.PDF
QuestysFileName
INSTALL 2006
QuestysRecordDate
4/24/2018 10:24:48 PM
QuestysRecordID
3865777
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-r lies <br /> ur <br /> Turbine • • • • <br /> Vacuum Testable Lid Assembly <br /> UST regulations in some areas require turbine enclosures (TE's)to be periodically <br /> tested for tightness. These regulations often require the TE including lid, joints, <br /> and piping penetrations be tested after installation and over the lifetime of the 9 <br /> system. <br /> In response to these regulations CSI can provide a watertight and testable lid <br /> designed to fit on CSI model WTE and PTE turbine enclosures. <br /> The watertight lid contains quick connect fittings for the vacuum gun and gauge watertight test Lia <br /> as well as a connection point for a thermometer to track temperature change <br /> during the test. The WTL Test Kit, available from CSI, is required to perform your <br /> Turbine Enclosure integrity test. <br /> Field-Installed Piping and Electrical Fittings <br /> Secondary pipe fittings can be field installed using one of our optional two-piece FRP couplings. <br /> When used for piping connections, the FRP coupling is designed to provide secondary containment <br /> connections only to the turbine enclosure. Do not use the FRP coupling for primary piping connections to the <br /> turbine enclosure. <br /> LL v <br /> = c <br /> w 2 <br /> FRP Coupling Kit(3"or 4'7 <br /> S m A two-piece field-installed 3" or 4" FRP coupling can be cemented in the turbine <br /> enclosure to provide a watertight seal for piping penetrations in high groundwater FEMALE <br /> TURBINE ENCLOSURE WALUIN ERIOfl <br /> environments. SECTION MALE SECTION �A{DHESIVE <br /> The FRP coupling is a two-piece fitting which is cemented to the turbine <br /> enclosure. The FRP coupling's male and female sections are threaded together to <br /> hold the fitting in place while the adhesive cures. Each kit(Kit FC-3 or FC-4)includesFRF coupling Kit <br /> the adhesive and mixing instructions. (for 3'or 4"OD FRP pipe only) <br /> Flexible Entry Boot(FEB) <br /> .Flexible entry boots are rubber compression type boots installed into the wall of <br /> the turbine enclosure to seal all pipe and conduit entries. These boots are <br /> designed to permit up to a 300° angle of flexibility for entries. This flexibility is <br /> important for aligning pipe connections or as a stress relief for the pipe during <br /> backfilling and ground movement.The flexible entry boot is available for standard <br /> 3"and 4" secondary piping and 3/4"conduit lines. <br /> Flexible Entry Boot <br /> 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.