My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
116
>
2300 - Underground Storage Tank Program
>
PR0523684
>
INSTALL_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 4:22:05 PM
Creation date
11/8/2018 9:53:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2006
RECORD_ID
PR0523684
PE
2351
FACILITY_ID
FA0015977
FACILITY_NAME
Fast Lane Central Valley
STREET_NUMBER
116
STREET_NAME
ROTH
STREET_TYPE
Rd
City
Lathrop
Zip
95330
APN
196-02-020
CURRENT_STATUS
01
SITE_LOCATION
116 Roth Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\116\PR0523684\INSTALL 2006.PDF
QuestysFileName
INSTALL 2006
QuestysRecordDate
4/24/2018 10:24:48 PM
QuestysRecordID
3865777
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Executive Order VR-202-A <br /> Healy Phase II EVR System <br /> Including Veeder-Root ISD <br /> Exhibit 2 <br /> System Specifications <br /> This exhibit contains the installation, maintenance and compliance standards and <br /> specifications that apply to the Healy Phase II EVR System Including Veeder-Root ISD <br /> installed in a gasoline dispensing facility. All components must be installed in <br /> accordance with the specifications in the ARB Approved Installation, Operation and <br /> Maintenance Manual for the Healy Phase II EVR System Including Veeder-Root <br /> ISD System. <br /> Nozzle <br /> 1. A vapor collection boot shall be installed on the nozzle at the base of the spout, as <br /> shown in Figure 213-1. <br /> 2. The Healy Model 900 nozzle has an integral vapor valve which prevents the loss of <br /> vapor from the underground storage tanks, ensures proper operation of the system <br /> and prevents the ingestion of air into the system. Any dispenser that has a nozzle <br /> installed that is determined to have a defective vapor valve, as described in items 3 <br /> or 4 below, shall be immediately removed from service (including nozzle(s) on both <br /> sides of dispenser) and a call for repair made immediately. <br /> 3. The maximum allowable leak rate for the nozzle vapor path, as determined by <br /> TP-201.26, shall not exceed the following: <br /> 0.038 cubic feet per minute (CFH) at a pressure of two inches water column <br /> (2.00" wc), and <br /> 0.10 CFH at a vacuum of one hundred inches water column (-100.00" wc) <br /> 4. Verification of the integrity of the vapor valve can be performed on installed <br /> nozzles using the nozzle bag test procedure in Exhibit 7. <br /> Vapor Collection <br /> 1. The WL ratio of the system shall be 1.05 plus or minus 0.10 (0.95 to 1.15), <br /> measured at a flow rate between six and ten gallons per minute (6.0 — 10.0 gpm). <br /> Any fueling point whose V/L ratio is determined to be at or below 0.80 shall be <br /> deemed defective and removed from service. The V/L ratio shall be determined by <br /> using the test procedure in Exhibit 5 with the shut-off port excluded. <br />
The URL can be used to link to this page
Your browser does not support the video tag.