Laserfiche WebLink
• 0 <br /> F. l.n-'l'ink Gauging/SIR Equipment: (X) Check this box if tank ganging is used only for inventory control. <br /> ( ) Check this box if no tank gauging or SIP,equipment is installed. <br /> `.('kris sec an must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: NSA <br /> O Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> O Yes ❑ No* Were all tank gauging probes visually inspected for danage and residue buildup? <br /> ()Yes ❑ No* Was accuracy of system product level readings tested? <br /> O Yes No* Was accuracy of system water level readings tested? <br /> O Yes ❑ NO Were all probes reinstalled properly? <br /> O Yes ❑ No'! Were all items on the equipment manufacturer's maintenance checklist completed? <br /> " In the Section fi,below,describe how and when these deficiencies were or will he corrected. <br /> G. Line Leak Detectors (LLA): O Check this box if LLDs arc not installed. <br /> Complete the 11ollowin checklist: <br /> © Yes Nn* For equipment start-up or annual equipment certitieation, was a leak simulated to verify LLD performance? <br /> N/A (Check all lhw app1V.) Simulated leak rate: ®3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.h. <br /> 0 Yes No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> I 1 Yes No* Was the testing apparatus properly calibrated? <br /> rJ Yes No* For mechanical LI.Ds,does the LLD restrict product Flow if it detects a leak? <br /> N/A <br /> ❑ Yes Q No* For electronic L.I,Ds, does the turbine automatically shut off if the LLD detects a leak? <br /> x N/A <br /> ❑ Yes ZI NO For electronic LI.Ds, does the turbine automatically shut off if any portion of the monitoring system'is disabled <br /> N/A or disconnected? <br /> • Yes No* For electronic LLDs,does the turbine automatically shut ol'f if any portion of the monitoring system malfunctions <br /> x N/A or fails a test? <br /> • Yes No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> x N/A <br /> © Yes U No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> ,, In the Section Fl,below,describe how and when these deficiencies were or will be corrected. <br /> Fi. Comments: <br /> Page 3 of 4 nsmt <br />