My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
707
>
2300 - Underground Storage Tank Program
>
PR0505735
>
COMPLIANCE INFO 2008 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 3:29:34 PM
Creation date
11/8/2018 9:53:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2015
RECORD_ID
PR0505735
PE
2361
FACILITY_ID
FA0006972
FACILITY_NAME
TSI TRANS SYSTEM INC
STREET_NUMBER
707
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231-9774
APN
19332008
CURRENT_STATUS
01
SITE_LOCATION
707 E ROTH RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\707\PR0505735\COMPLIANCE INFORMATION 2008 - 2015.PDF
QuestysFileName
COMPLIANCE INFORMATION 2008 - 2015
QuestysRecordDate
6/29/2018 3:29:31 PM
QuestysRecordID
3930717
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tv nit Gauging/SIR Equipment: (N) Checl(this box if tank gauging is used only for inventory control. <br /> ( ) Check this box if no tank gauging or SIR equipment is installed, <br /> This sect],3n mast be completed if in-tank gauging equipment is used to perform leak detection monitoring, <br /> Complete I,he following checklist: NSA <br /> O Ycs No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> O Yes No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ()Yes No* Was accuracy of system product level readings tested? <br /> O Xes No* Was accuracy of system water level readings tested? <br /> ()Yes No* Were all probes reinstalled properly? <br /> O <br /> Yes M No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section 1.1,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Unit Detectors (LLD): O Check this box if LLDs are not installed, <br /> Complete the fullowinz checklist: <br /> yOYes No" For equipment start-up or annual equipment ceai4Qtion, was a leak simulated to verify LLD performance? <br /> N/A (Check all that apply) Simulated leak rate: g.p. ,❑0.1 g.p,h ; ❑ 0.2 g.p,h. <br /> ¢Yes M No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Ycs No* Was the testing apparatus properly calibrated? <br /> -r Yes qI No* For mechanical LI,Ds,does the LLD restrict product Plow if it detects a leak? <br /> N/A <br /> n/a No* hor electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> ❑ Yes I] No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> N/A ordisennnected? <br /> ❑ Yes Q No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malftmetions <br /> 11 N/A or fails a tcst7 <br /> 0 Yes No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> N/A <br /> )c Yes E No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Se4 tion N,below,describe how and waren these deficiencies were or will be corrected. <br /> II. comil ents: <br /> Page 3 or 4 aa/al <br />
The URL can be used to link to this page
Your browser does not support the video tag.