Laserfiche WebLink
iu•T�nk Gttuing/ SIR Equipment: (X) Check this box if tank gaging is used only for inventory control. <br /> F. ( ) Check this box if no tank gauging or SiR equipment is installed. <br /> This section inust be completed if in-tank gauging equipment is used to perl7orm leak detection monitoring. <br /> Complete the following checklist: N/A <br /> O Yes U No* Etas all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> O Yes ❑ No* Were all tank gauging probes visually inspected for datmge and residue buildup? <br /> ()Yes ❑ No* Was accuracy of system product level readings tested? <br /> O yes No* Was accuracy of system water level readings tested? <br /> O Yes ❑ No* Were all probes reinstalled properly? <br /> O Were all items on the equipment manu£achtrer's maintenance checklist completed? <br /> Yes ❑ No* <br /> *In the Sectioh H,below,describe how and when these deficiencies were or will be corrected. <br /> C.. Line Leak Detectors (LLD): (X) Check this box if LLDs Etre not installed. <br /> Com let%t e ftilluwin checklist:. <br /> Yes 0 No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> C1 N/A (Check all that apply) Simulated leak rate: 3 g.p.h.; D 0.1 g.p.h ;❑0.2 g.p•h• <br /> Yes Q No* Were all LLDs con Firmed opetational and accurate within regulatory requirements? <br /> Yes q No* Was the testing apparatus properly calibrated? <br /> Yes a No* For mechanical LLDs;does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> ❑ Yes O No* For electronic LLDs,does the turbine automatically shut off if the LLD detect%a leak? <br /> NIA ortion of the monitoring system is disabled <br /> ❑ Yes d No* Par electronic LLDs, does the turbine automatically shut off if any p <br /> N/A or disconnected? <br /> O Yes No* Far electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> N/A or fails a test? <br /> ❑ Yes Ll No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A. <br /> Yes Ll No" Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * in the Section H, below,describe now and when these deficiencies were or will be corrected. <br /> H. Commetta• <br /> Page 3 of 4 03/01 <br />