My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2008 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
707
>
2300 - Underground Storage Tank Program
>
PR0505735
>
COMPLIANCE INFO 2008 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2023 3:29:34 PM
Creation date
11/8/2018 9:53:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008 - 2015
RECORD_ID
PR0505735
PE
2361
FACILITY_ID
FA0006972
FACILITY_NAME
TSI TRANS SYSTEM INC
STREET_NUMBER
707
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231-9774
APN
19332008
CURRENT_STATUS
01
SITE_LOCATION
707 E ROTH RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\R\ROTH\707\PR0505735\COMPLIANCE INFORMATION 2008 - 2015.PDF
QuestysFileName
COMPLIANCE INFORMATION 2008 - 2015
QuestysRecordDate
6/29/2018 3:29:31 PM
QuestysRecordID
3930717
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Results of Testing/Servicing • <br /> !1 <br /> Software Version installed: 8.04 <br /> Com late the folio in checklist: <br /> ® Yes ❑ No Is the autlible alarm operational? <br /> ® Yes ❑ No' I-- <br /> 0 <br /> e® Yes ❑ No" Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ® Yes ❑ No• Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br /> operation? <br /> ❑ Yes ❑ No' If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.,motlem)operational? <br /> ® N/A <br /> ® Yes ❑ No' For pressurized piping systems,does the turbine automatically shut tlown if the piping secontlary ta <br /> ❑ N/A fails to operate, is electrically disconnected? If yes: which sensors initiatconinment monitoring system detects a leak, <br /> e positive shut-down? (Check al/that apply) ® Sumplfrench <br /> Sensors; 181 Dispea nser Containment Sensors. <br /> Did you confine positive shut-down due to leaks and sensor failure/disconnection? ®Yes; ❑No. <br /> ❑ Yes ❑ No` For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e., no mechanical overall prevention valve is <br /> ® N/A installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating property? If so,at what percent of tank capacity <br /> does the alarm trigger? % <br /> ❑ Yes ® No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced and fist the manufacturer name <br /> and model for all replacement parts in Section E,below. <br /> ❑Yes' ® No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑Water. If yes,describe causes in Section E,below. <br /> ® Yes ❑ No'l Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> ® Yes ❑ No` Is all monitonng equipment operational per manufacturer's specifications? <br /> 'In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: <br /> Monitoring System ertificatlon Page 2 of 4 2)21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.