My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2003 - 2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
8606
>
2300 - Underground Storage Tank Program
>
PR0232261
>
COMPLIANCE INFO 2003 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 1:10:35 PM
Creation date
11/8/2018 9:54:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2006
RECORD_ID
PR0232261
PE
2361
FACILITY_ID
FA0002590
FACILITY_NAME
THORNTON 76
STREET_NUMBER
8606
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
07242019
CURRENT_STATUS
01
SITE_LOCATION
8606 THORNTON RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\THORNTON\8606\PR0232261\COMPLIANCE INFO 2003 - 2006.PDF
QuestysFileName
COMPLIANCE INFO 2003 - 2006
QuestysRecordDate
2/27/2018 6:46:39 PM
QuestysRecordID
3808828
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page-J—of <br /> • 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ® Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ®Pressure ❑ Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: DIAL GAUGE Equipment Resolution: 0 to 15"psi <br /> Piping Run# g r( Piping Run# 21 Piping Run# '+ Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: <br /> Piping Diameter: t P <br /> Length of Piping Run: <br /> Product Stored: _ <br /> Method and location of <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> starting test: - <br /> Test Start Time: <br /> Initial Reading(RI): 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test End Time: 91, 00 / . L S --- <br /> Final Reading(RF): PSI PSI ^- PSI PSI <br /> Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-RO: PSI 0 PSI PSI PSI <br /> Pass/Fail Threshold or Zero Zero Zero Zero <br /> Criteria: <br /> Test ResnYf: bass ❑Fail Pass <br /> Fail <br /> ;Pass ❑F <br /> ail . ❑ Pass` ❑Fail <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> C70—° <br /> 1 A,/ <br /> Conoco Phillips#2708671 <br /> 8606 Thornton Rd. <br /> Stockton, CA. 95209 <br /> N04598—SB 989 Testing <br />
The URL can be used to link to this page
Your browser does not support the video tag.