Laserfiche WebLink
. • � <br /> SWPage 5 <br /> RCB,January 2002 ofS-- <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC)TESTING <br /> Test Method Developed By: ❑UDC Manufacturer Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum VHydrostatic <br /> ❑Other(Spec) <br /> 7 t GIM- Equipment Resolution: <br /> Test Equipment Used: G �'IC <br /> Ni <br /> UDC# K UDC# UDC# UDC# <br /> UDC Manufacturer. <br /> UDC Material: <br /> UDC D the R" 9 <br /> Height from UDC Bottom to Top L`` Q <br /> of Highest Pi in Penetration: 4)OAV r^ v0 <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: &4=11orb <br /> Condition of UDC prior to <br /> testing: <br /> A►C' <br /> Portion of UDC Tested' J2 M i <br /> Does turbine shut down when _ t�TA � <br /> UDC sensor detects liquid(both ❑Yes ❑No ❑Yes ❑No 7NA ❑Yes ❑No �NA ❑Yes ❑No TM <br /> product and water)?` <br /> Turbine shutdown response time 14 A Is system programmed for fail- ❑Yes ❑NoNA f;' <br /> ❑NoNA ❑Yes ❑No NA <br /> safe shutdown?`Was fail-safe verified to be O Yes ❑No NA ❑Yes ❑No � � ❑Yes ❑No Y.NA <br /> operational?* <br /> Wait time between applying u L/ <br /> pressure/vacuum/water and rf4 M I p <br /> starting test - <br /> Test Start Time: Oq '9S <br /> Initial Readin ): <br /> Test End Time: 1 ' 2`I 'DO <br /> Final Reading ): q q -I .'Iles O <br /> Test Duration: I S m <br /> Change in Reading jQ 33 0002,7 <br /> Pass/Fail Threshold or Criteria: y OG 0 t . <br /> Test Result +Pass ❑Fail r Tq Pass :-,OF,il` D;Pass . Fa>i <br /> Was sensor removed for testing? Gl fes ❑No GI'NA j]` ❑No ?I'M <br /> ❑No ❑NA Q(Yes ❑No ❑NA <br /> Was sensor properly replaced and lives ❑No ffNA J1 Yes ❑No MNA .ayes ❑No ❑NAyes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> Conoco Phillips#2708671 <br /> 8606 Thornton Rd. <br /> Stockton, CA. 95209 <br /> N04598—SB 989 Testing <br /> 'If the entire depth of the UDC is not tested,specify how much was tested. If the answer to M of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />