Laserfiche WebLink
SWRCB,•January 2002 0 Page 2 <br />9. SPILL/OVERFILL CONTAINMENAXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes: <br />Spill/Overfill Containment Boxes are Present, but were Not Tested: <br />Test Method Developed By: <br />F-1Spill Bucket Manufacturer <br />El Other (Specify) <br />❑x <br />Industry Standard Professional Engineer <br />Test Method Used: <br />F]Pressure <br />El Other (Specify) <br />❑X <br />Vacuum Hydrostatic <br />Test Equipment Used: <br />Bucket Diameter: <br />Spill Box # 87 Spill Box # 89 <br />11 11 <br />Equipment <br />Resolution: <br />Spill Box # 91 <br />Spill Box # <br />11 <br />Bucket Depth: <br />11 <br />l i <br />10 <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />imin <br />1 <br />1 <br />Test Start Time: <br />1220 <br />1225 <br />1230 <br />Initial Reading (R1 ): <br />-30" <br />-30" <br />-30" <br />Test End Time: <br />1221 <br />1226 <br />1231 <br />Final Reading (RI: ): <br />- 3011 <br />-30" <br />- 3 0 " <br />Test Duration: <br />Change in Reading (R F - Ri) <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />l Pass ❑ Fail <br />El <br />Pass 7 Fail <br />Pass D Fail <br />Pass Fait <br />Comments - (include information on repairs made prior to testing. and recommended follow-up for failed tests) <br />