Laserfiche WebLink
cSollwareversion Installed: <br /> Corn lets e following checklist: -- <br /> es -❑ No* Is the audible alarm operational? <br /> es ❑ No* Js,thev'sual alarm o erational? <br /> LIYYes 0,"&0* Were all senors visually ins ected, functionally tested,and confirmed operational? <br /> es ❑ NO Were all sensors installed at lowest point of secondary containment and positioned so that other <br /> not interfere with their proper operation9 <br /> equipment will <br /> ❑ Yes ❑ No* alarms are relayed to a remote monitoring station, is all communications equipment . mod <br /> /A operational? (e.g em) <br /> es ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> Positive shut-down? (Check all that apply) <br /> Did ou confirm ositive shut-down due to leaksTrench Sensors;en or failure/disco❑rmelcton?Dispenser Containment Sensors. <br /> ❑ Yes ❑ No* -For tank systems that utilize the monitoring system as. the rima No. <br /> N/A mechanical overfill prevention valve is installed), is the overfill warning tank overfill <br /> and audiblewarning at the tank <br /> fill Doint(s)and o eratm, ro erl ? If so,at what percent of tank ca aci does the alarm trigger? <br /> ❑ Yes* 1�1Qo Was any monitoring equipment replaced? If yes, identify specific sensors,probes, or other a ui ment re <br /> and list the manufacturer name and model for all replacement arts m Section E, below. q p Placed <br /> ❑ Yes* o Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) ❑ <br /> Product; LJ Water. If yes,describe causes in Section E,below. <br /> es ❑ No* Was monitorin s stem set-u reviewed to ensure ro er settin s?Attach set u re orts, if a licable <br /> ❑ Yes No* Is all monitoringequipment oerational er manufacturer's specifications? <br /> ch <br /> * In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: A <br /> J7 4v P! C�G'd7YD <br /> E <br /> Page 2 of 3 <br /> 03/01 <br />