Laserfiche WebLink
SWRCB,JAnuary 2002 IS <br /> Page 3 <br /> 9 SECONDARY PIPE TESTING <br /> Test Method Developed By: X❑ Tank Manufacturer F-1 Industry Standard Professional Engineer <br /> El Other (Specify) <br /> Test Method Used: ❑X Pressure Vacuum El Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Run# 1 PRE Piping Run# Piping Run# Piping Run# <br /> Piping Material: FIBERGLASS <br /> Piping Manufacturer: SMITH <br /> Piping Diameter: 3 IN <br /> Length of Piping Run: 100 <br /> Product Stored: PREMIUM <br /> Method and location of PREMIUM <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 MIN <br /> starting test: <br /> Test Start Time: 13 :11 <br /> Initial Reading(Pi ): 3 PSI <br /> Test End Time: 14 :11 <br /> Final Reading(RF ): 3 PSI <br /> Test Duration: 1 HR <br /> Change in Reading(RF-I I ): 0 <br /> Pass/Fail Threshold or 0. <br /> Criteria <br /> a F s y <br /> owl <br /> L �3 <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />