My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
8606
>
2300 - Underground Storage Tank Program
>
PR0232261
>
COMPLIANCE INFO 2007 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 1:19:49 PM
Creation date
11/8/2018 9:54:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2010
RECORD_ID
PR0232261
PE
2361
FACILITY_ID
FA0002590
FACILITY_NAME
THORNTON 76
STREET_NUMBER
8606
STREET_NAME
THORNTON
STREET_TYPE
RD
City
STOCKTON
Zip
95209
APN
07242019
CURRENT_STATUS
01
SITE_LOCATION
8606 THORNTON RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\THORNTON\8606\PR0232261\COMPLIANCE INFO 2007 - 2010.PDF
QuestysFileName
COMPLIANCE INFO 2007 - 2010
QuestysRecordDate
2/27/2018 5:13:36 PM
QuestysRecordID
3808429
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 ! • Page 4 - <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer Industry Standard X❑ Professional Engineer <br /> Other (Specify) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used: VPLT Equipment Resolution: <br /> Sump# 1 PRE Sump# Sump# Sump# <br /> Sump Diameter: 48 <br /> Sump Depth: 5 FT <br /> Sump Material: FIBERGLASS <br /> Height from Tank Top to Top of 14 IN <br /> Highest Piping Pentration: <br /> Height from Tank Top to Lowest 4 IN <br /> Electrical Pentration: <br /> Condition of sump prior to testing: GOOD <br /> Portion of Sump Tested: 1 16 IN <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X❑Yes❑No❑N [:]Yes❑No❑N ❑Yes❑No❑N [:]Yes❑No❑N <br /> product and water)?* <br /> Turbine shutdown response time: 2-5 SEC <br /> Is system programmed for fail-safe ❑ ❑ [:]Y ❑ [:]Yes❑ � ❑ ❑ <br /> Yes N N Yes N N N N Yes No <br /> shutdown?* <br /> Was fail-safe verified to be ❑Yes❑No❑N ❑Yes❑No❑N ❑Yes❑No❑N ❑Yes❑No�i <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 MIN <br /> test: <br /> Test Start Time: 13 :4 3 <br /> Initial Reading(R1): 9.350 <br /> Test End Time: 14 :13 <br /> Final Reading(RF): 9.350 <br /> Test Duration: 30 MIN <br /> Change in Reading(R F-R1 ): 0 <br /> Pass/Fail Threshold or Criteria: .05 GPH <br /> Was sensor removed for testing. Yes N NA Yes N NA Yes N NA Yes No <br /> Was sensor properly replaced and ❑ ❑ ❑ ❑ ❑ ❑ _�I ❑ ❑ f—h, <br /> verified functional after testing? Ye N NA Ye N NA Ye N JNA Yes N <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1 If the entire depth of the sump is not tested, specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO" or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.