Laserfiche WebLink
SWRCB,January 2002 Page 1. <br /> s Second g P <br /> Containment Testing Re •t Form <br /> This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the <br /> appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and <br /> printouts from tests(if applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION <br /> FacilityName: CONOCO PHILLIPS #2708671 Date of Testing: 09/04/2007 <br /> Facility Address: 8606 THORNTON ROAD STOCKTON, CA, 95209 <br /> Facility Contact: MANAGER Phone: (2 0 9) 478-8959 <br /> Date Local Agency Was Notified of Testing <br /> Name of Local Agency Inspector(if present during testing): <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: TANKNOLOGY, INC. <br /> Technician Conducting Test: MATTHEW HASLEY <br /> Credentials: CSLB Licensed Contractor SWRCB Licensed Tank Tester <br /> License Type.. License Number: <br /> Manufacturer Training <br /> Manufacturer Component(s) Date Training Expires <br /> tanknology all 05/29/2009 <br /> 3. SUMMARY OF TEST RESULTS <br /> Not Repairs Not Repair <br /> Component Pass Fail Tested Made Component Pass Fail Tested M <br /> ade <br /> Tank Annular 1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Tank Annular 2 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Tank Annular 3 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Secondary Pipe 1 sup ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Secondary Pipe 2 plus E ❑ ❑ ❑ ❑ ❑ ❑ El <br /> Secondary Pipe 3 reg X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Piping Sump 1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Piping Sump 2 X ❑ ❑ ❑ ❑ ❑ ❑ El- <br /> Piping <br /> Piping Sump 3 El ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> UDC 1/2 ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> UDC 3/4 ❑ ❑ ❑ ❑ ❑ ❑ El- <br /> El <br /> El El El E El E <br /> If hydrostatic testing was performed,describe what was done with the water after completion of tests: <br /> site to site <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements <br /> Technician's Signature: ;oo Date: 09/04/2007 <br />