Laserfiche WebLink
SWRCB,January 2002 . • Page 3 . <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes: ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested: El —1 <br /> Test Method Developed By: F-1Spill Bucket Manufacturer Industry Standard Professional Engineer <br /> El Other(Specify) <br /> Test Method Used: F-1 Pressure Vacuum x1 Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# 3 UNL FILL Spill Box# 3 UNL VAPOR Spill Box# Spill Box# <br /> Bucket Diameter: 111, 1111 <br /> Bucket Depth: 111E 11" <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 11:2 5 11:2S <br /> Initial Reading(Ri ): 6" BIT <br /> Test End Time: 12 :2 5 12 :2 5 <br /> Final Reading(RF ): 611 811 <br /> Test Duration: 1 HR 1 HR <br /> Change in Reading(R F-RI ) 0 0 <br /> Pass/Fail Threshold or PASS PASS <br /> Criteria: <br /> 1 0010 <br /> 10140 10 <br /> Z G' <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />