Laserfiche WebLink
Page 1 of 2 <br />Garrett Backus [EH] <br />From: Maria Guarnelli [Maria@alphapetro.com] <br />Sent: Wednesday, November 12, 2008 1:24 PM <br />To: Garrett Backus [EH] <br />Subject: RE: Thornton 76 <br />Garrett, <br />Per my construction superintendent all possible leaks will fall into the UDC. There is <br />no transition collar for this application. If you need any further information please let <br />me know. <br />Thanks, <br />Maria <br />Maria Guarnelli / Testing Coordinator <br />Alpha Petroleum Services, Inc. <br />707-678-8100 Office <br />707-301-8902 Cell <br />From: Garrett Backus [EH] [mai Ito: gbackus@sjcehd.com] <br />Sent: Wednesday, November 12, 2008 8:39 AM <br />To: Maria Guarnelli <br />Subject: RE: Thornton 76 <br />Thank you for the dispenser footprint diagram. It looks like the width of the dispenser <br />is larger than the existing UDC width. Will dispenser piping leaks that are above grade <br />drain into the existing UDC? <br />11/13/2008 <br />