My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
29633
>
2300 - Underground Storage Tank Program
>
PR0231422
>
REMOVAL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 3:45:46 PM
Creation date
11/8/2018 9:54:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1995
RECORD_ID
PR0231422
PE
2381
FACILITY_ID
FA0003781
FACILITY_NAME
TRACY AIRPORT
STREET_NUMBER
29633
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
25311031
CURRENT_STATUS
02
SITE_LOCATION
29633 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TRACY\29633\PR0231422\REMOVAL 1995 .PDF
QuestysFileName
REMOVAL 1995
QuestysRecordDate
8/22/2017 7:03:09 PM
QuestysRecordID
3601039
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 • <br /> A5.0 ESTIMATED SCHEDULE <br /> It is estimated that it would take about six weeks to complete the work in this <br /> delivery order (see Figure A-4). Site reconnaissance and mobilization (Task 1) <br /> and exposure of tank and piping (Task 2) would require about one week together. <br /> The removal of piping (Task 3) and tank (Task 4) will start simultaneously; it would <br /> take the next two weeks. The disposal of piping, tanks, and tank contents (Tasks 3 <br /> and 4) will start during the third week complete during the fourth week. Following <br /> this, sampling and analysis of soil (Task 5) will be performed. This task will take <br /> about two weeks to complete. Analytical turnaround time is 10 working days, <br /> unless rush analysis is ordered. Tank closure report preparation (Task 9) will start <br /> on the 5th week and is expected to be completed in 2 weeks. <br /> A-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.