Laserfiche WebLink
0 • <br /> 11) All shoring systems shall incorporate the soil specification and conditions for <br /> that particular site. The installation of shoring systems shall be conducted in <br /> such a way that the employee is properly protected from the potential of <br /> cave-ins. Additionally, the removal of the system shall follow the same <br /> requirement. <br /> 12) If the excavation exceeds 20 feet, or if an alternative shoring, sloping, or <br /> benching system is utilized, a registered professional engineer shall prepare <br /> detailed plans showing the materials and methods to be utilized. <br /> 13) The detailed plans in #12 above, shall be available for inspection at the site. <br /> 14) Shoring shall be installed in accordance with GISO 1541.1, Appendices C&D. <br /> 15) If protective shields, (i.e. trench box or shield) are to be utilized for the <br /> protection of employees within an excavation, a registered professional <br /> engineer must prepare the necessary calculations and designs prior to the use <br /> of such equipment. <br /> • <br /> 8 <br />