Laserfiche WebLink
9. THREE PHASt INSPECTION <br /> i <br /> ADVANCE NOTICE OF PREPARATORY, INITIAL OR FINAL FOLLOW-UP INSPECTION: (minimm five working days notice required) <br /> PREPARATORY INSPECTION HELD TODAY: Indicate Definable Features of Work. Attach Preparatory Checklist. <br /> INITIAL INSPECTION HELD TODAY: Indicate Definable Features of Work. Attach Initial Checklist. <br /> FINAL FOLLOW-UP INSPECTION HELD TODAY: Indicate HAS Activity Number. Attach Final Follow-up Checklist. <br /> 10. ACTIVITIES IN PROGRESS: Attach daily COC follow-up inspection deficiencies/corrections noted. <br /> S--START <br /> ACTIVITY NUMBER C=CONTINUING DESCRIPTION OF WORK ACTUALLY PERFORMED/MAJOR MATERIAL DELIVERIES TODAY <br /> F=FINISH <br /> I <br /> 11. COC TESTING <br /> ACTIVITY NUMBER DESCRIPTION OF TESTS PERFORMED PASSED/FAILED <br /> • <br /> 12. USER SCHOOLING CONDUCTED: <br /> ACTIVITY NUMBER DESCRIPTION OF SCHOOLING <br /> 13. INSTALLED PROPERTY PRICING DATA ATTACHED: YES_ NO_ <br /> 14. TRANSFERRED PROPERTY, DD-1149 ATTACHED: YES_ NO_ <br /> 15. QA COMMENTS CORRECTED TODAY: YES NO <br /> 16. EQUIPMENT SAFETY CHECKLIST ATTACHED: YES_ NO_ <br /> GENERAL COMMENTS: <br /> _ONTRACTOR CERTIFICATION: On behalf of the contractor, I certify that this report is complete and correct and all equipment <br /> and material used and work performed during this reporting period are in compliance with the con- <br /> tract plans and specifications, to the best of my knowledge, except as noted above. <br /> Authorized Contractor Representative: <br /> Report Date: Date Submitted to Government Representative: <br />