My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
29633
>
2300 - Underground Storage Tank Program
>
PR0231422
>
REMOVAL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 3:45:46 PM
Creation date
11/8/2018 9:54:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1995
RECORD_ID
PR0231422
PE
2381
FACILITY_ID
FA0003781
FACILITY_NAME
TRACY AIRPORT
STREET_NUMBER
29633
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
25311031
CURRENT_STATUS
02
SITE_LOCATION
29633 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TRACY\29633\PR0231422\REMOVAL 1995 .PDF
QuestysFileName
REMOVAL 1995
QuestysRecordDate
8/22/2017 7:03:09 PM
QuestysRecordID
3601039
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• SECTION G <br /> QUANTITY SURVEY PLAN <br /> G1.0 QUANTITY SURVEY PLAN <br /> All surveying performed as part of this Delivery Order will be performed by Vail <br /> Engineering Corporation, Sacramento, California, registration number LS 5614. A copy of <br /> the surveyor's license is contained in the GMP. Surveying will locate, measure, and <br /> record the UST location, as well as the volume of the excavation, in order to certify <br /> compliance with the Delivery Order and provide a basis for payment. <br /> Quantities of disposed liquid/sludge will be obtained from the weight tickets provided by <br /> the disposal facilities. <br /> Prior to beginning excavation activities on the site, a survey will be conducted showing <br /> existing structures, assumed UST location as described in the specification. <br /> After the excavation activities are complete, the area will be surveyed again to establish <br /> quantities removed and accurately delineate the excavated area for the closure report. <br /> Linear foot items (piping and security fencing) will be coordinated with the COR in order to <br /> • verify quantities. <br /> A copy of the survey results, including calculations, will be submitted after completion of <br /> field activities. The anticipated schedule for the surveying is approximately one week <br /> following the start of work. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.