My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1995
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
29633
>
2300 - Underground Storage Tank Program
>
PR0231422
>
REMOVAL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 3:45:46 PM
Creation date
11/8/2018 9:54:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1995
RECORD_ID
PR0231422
PE
2381
FACILITY_ID
FA0003781
FACILITY_NAME
TRACY AIRPORT
STREET_NUMBER
29633
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
25311031
CURRENT_STATUS
02
SITE_LOCATION
29633 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TRACY\29633\PR0231422\REMOVAL 1995 .PDF
QuestysFileName
REMOVAL 1995
QuestysRecordDate
8/22/2017 7:03:09 PM
QuestysRecordID
3601039
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A -- Summary of Ra•reme{.4 • <br /> proper understanding of the terms utilized in this <br /> SOW, a glossary can <br /> When a term is used in the text Specifications <br /> out <br /> be found in Exhibit G. ( craning shall be applicable. ) Pe <br /> explanation, the glossary computer-readable form appear in Exhibit H. <br /> for reporting data in comp <br /> or Task Arses. For each sample, the Contractor <br /> alfor <br /> 4.2 overview of Haj S ific requ <br /> perform the tasks ducribed in this section: PK <br /> each task are detailed in the exhibits as referenced. <br /> d 2 1 Task 1' Chain-of-Custody iwe and maintain <br /> 1.2.1.1 Chain-of-C She Contractor shall masse <br /> samples under Proper chain-of-custody procedures. All aped at ed <br /> a shall W developed and <br /> I document control and inventory Procqdurs in' shall be required <br /> followed. Documentation. As descrl"drttrhictiY followed- This <br /> • are bei=W ' le Delivery <br /> to show that all procedure rted u the Complete tamQ <br /> documentation shall be rOPo Contractor shall establish <br /> I Croup Vile (CST) (see Exhibit ■) • le confidential in <br /> and use appropriate procedures to hand ific <br /> received from the Agsncy- See Zshibit i for spec <br /> requ iremant s. <br /> 1.2.1.2 ts• Sample shipments to the Contractor's <br /> SamPle Scheduling/Shipmenwill be scheduled and coordinated by the CLP Sample <br /> She Contractor shall ecweu icate with <br /> facility <br /> Management office (am) throughout the process of <br /> SM personnel by tslsphone, as alyeesand data reporting' to <br /> sample scheduling, shipment' analysis <br /> ' ) ensure that samples ars properly processed. <br /> SampUs will be shipped routinely to the Contractor rough an <br /> 4.2.1.2.1 sped Los. However, as necessary, <br /> overnight delivery handling or processing <br /> Contractor shall be raaponsibls for any ick-up <br /> required for the receipt of sample shipments' including P <br /> Of samples at the near servicing airport, bus station or <br /> R ther carrihe er sOrvtor within <br /> bethe <br /> evCCcilable toatr&ctorlr'ace vel asasple <br /> shall ating. <br /> shipments At any tier the delivery servics is oper <br /> including Saturdays- <br /> s- � mimed media, <br /> I! there ars problems with tbm sampleie(�ntation/paperwork <br /> 4.2.1.2.2 le and Traffic <br /> containers broken or s not <br /> with <br /> r shipsent, wP <br /> (e.g. . <br /> Traffic 1leportscorrespond) <br /> spored) the Contractor shall <br /> Report numbers do act The contractor shall <br /> immediately contact SHO for lut Problem � laboratory <br /> immsdiatslY not b110 !eQarding any time of analyses and data <br /> conditions that affect the the tractor shall notify S1fo <br /> reporting. In particular' <br /> personnel in advance regarding sample data that will be date. <br /> delivered late and shall epscify the estimated delivery <br /> The Contractor shall accept all ■ample• scheduled by SMO' <br /> 4.2. 1.2.3 r of samples received in any <br /> ressed <br /> provided that the total numbs the monthly limitation exp <br /> calendar month does not exceed elect to accept <br /> in the contract. Should the Contractor <br /> OLH02.0 <br /> A-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.