Laserfiche WebLink
SWRCB,January 2002 Page 1 of 1 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes r <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested FF <br /> Test Method Developed By: Spill Bucket Manufacturer F, Industry Standard r Professional Engineer <br /> r Other(Specify): <br /> I est Method Used By: r Pressure r Vacuum r Hydrostatic <br /> r Other(Specify): <br /> Test Equipment Used:VACUUM TEST Equipment Resolution:0.1 gph <br /> Spill Box#Tank T I Spill Box#'fank'f2 Spill Box#Tank T3 <br /> SUPREME-Fill I- PLUS-Fill 1 -Direct- REGULAR-Fill 1- Spill Box# <br /> Direct-Grade level Grade level Direct-Grade level <br /> Bucket Diameter: 13.00 13.00 13.00 <br /> Bucket Depth: 13.25 13.50 13.25 <br /> Wait time between applying <br /> pressure/vacuum/water and 15 min 15 min 15 min min <br /> starting test <br /> Test Start Time: 09:00:00 09:01:00 09:02:00 <br /> Initial Reading(R1): 1.00 PSI 1.00 PSI 1.00 PSI <br /> Test End Time: 09:01:00 09:02:00 09:03:00 <br /> Final Reading(RF): 1.00 PSI 1.00 PSI 1.00 PSI <br /> Test Duration: 1 min I min 1 min <br /> Change in Reading(RF-RI): 0.00 PSI 0.00 PSI 0.00 PSI <br /> Pass/Fail Threshold or Criteria: +/-3.00 +/-3.00 +/-3.00 +/- <br /> es "ult: Pass Pass Pass <br /> COMMentS-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> WO:2309197 <br />