Laserfiche WebLink
4m rwe Tanknology <br /> Emergency Stop (E-Stop / ESO) Periodic Inspection <br /> Facility Information Technician Information <br /> Site#.98264 Date:2/25/2013 <br /> Address:3775 N.TRACY BLVD Name:Ryan Casey <br /> City/State:TRACY CA Technician Signature:' - <br /> The objective of this test is to provide assurance that the when the E-Stop switch is activated,all the fueling system circuits(turbines,and <br /> dispensers)are de-energized,and remain de-energized until they are re-set manually).The test procedures and guidelines shall be in accordance <br /> with the E-Stop Testing Process. <br /> SITE DATA <br /> 1 Number of E-Stop switches INSIDE of the building. 1 <br /> 2 Number of E-Slop switches OUTSIDE of the building: 1 <br /> PERFORMANCE DATA Yes No NA <br /> 3 You have added or confirmed that all E-Stop locations are on the Site Diagram r r f <br /> 4 Do all E-Stops shutdown power to ALL DISPENSERS G r r <br /> 5 Do all E-Stops shutdown power to ALL STP's IT r r <br /> 6 Are ALL E-Stops clearly Labeled IT r r <br /> 7 Are the TURBINE BREAKERS clearly identified/labeled IT r r <br /> POSTTEST <br /> 8 All equipment secured and any access ports, lids,enclosures are closed. IT r r <br /> 9 All safety barricades and test equipment has been properly removed IT r r <br /> 10 E-Stop was reset and all dispensing functions are normal IT r r <br /> E-Stop Inspection Results <br /> 11 PASS I FAIL I INCONCLUSIVE <br /> Comments(Cie"describe any deficiencies found) <br /> WO:2309197 <br />