My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3775
>
2300 - Underground Storage Tank Program
>
PR0231418
>
COMPLIANCE INFO 2012-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:19:01 PM
Creation date
11/8/2018 9:55:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2015
RECORD_ID
PR0231418
PE
2361
FACILITY_ID
FA0003715
FACILITY_NAME
Tracy Blvd Chevron
STREET_NUMBER
3775
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
3775 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TRACY\3775\PR0231418\COMPLIANCE INFO\COMPLIANCE INFO 2012-2015.PDF
QuestysFileName
COMPLIANCE INFO 2012-2015
QuestysRecordDate
10/10/2017 8:57:48 PM
QuestysRecordID
3096410
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_, 11/ <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 1868 East Hazelton Avenue, Stockton, California 95205-6232 <br /> Telephone: (209)468-3420 Fax: (209)468-3433 Web:www.sigov.org/ehd <br /> UNDERGROUND STORAGE TANK (UST) PROGRAM INSPECTION REPORT CONTINUED <br /> Facility Chevron USA Inc#98264 Facility 3775 North Tracy Blvd, Tracy IUnaspeection Feb 25, 2013 <br /> Name: Address: <br /> VIOLATIONS <br /> HSC=CA Health and Safety Code;CFR=Code of Federal R ulations <br /> # C1 C2 M I Code Section C1 =Class 1 violation;C2=Class 2 violation',M=Minor violation <br /> ` Non-Pressurized Piping(continued) <br /> 702 CCR 2643(e) Biennial tightness test of gravity piping not performed(pre-January 1, 1984) (M1) <br /> 703 CCR 2643(d) Triennial line test for conventional suction piping not performed(pre-January 1, 1984) (M1) <br /> `.i:Other Violations <br /> 999 Other: See attached"Continuation—Official Inspection Report"for violation(s)not listed above. <br /> SUMMARY OF VIOLATIONS <br /> CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> UST Inspection: Routine & Annual Monitoring System Certification <br /> Witness testing on 02/25/13. Provided facility check list of violation. <br /> Providing written violations on 03/15/13. <br /> 314. The light bulb used as part of the visual overfill prevention system was not currently functional on <br /> the UST. The light bulb was replaced, retested during the inspection and passed. <br /> 204. The designated operator failed to document all the alarms from the attached alarm history on the <br /> August and February 2012 designated operator monthly inspection reports and failed to check that they <br /> were responded to appropriately. The missing alarms include: <br /> -08/09/12 and 08/06/12 Fuel Alarm: L13 Supreme Fill Piping Sump, L14 Plus Fill Piping Sump and L15 <br /> Regular Fill Piping Sump . <br /> -02/16/12 and 02/17/12 Fuel Alarm: L12 Disp 11-12 Dispenser Pan <br /> -02/10/12 Sensor Out: L9 Disp 5-6 Dispenser Pan, L10 Disp 7-8 Dispenser Pan, L11 Disp 9-10 <br /> Dispenser Pan and L12 Disp 11-12 Dispenser Pan <br /> -Q1 91 PLLD Shutdown: on 05/17/12, 02/17/12, 02/16/12, 02/10/12, 02/07/12 <br /> -Q2 89 PLLD Shutdown: on 08/28/12, 07/27/12, 02/17/12, 02/16/12, 02/10/12 <br /> -Q3 91 PLLD Shutdown: on 02/17/12, 02/16/12, 02/15/12, 02/10/12, 02/10/12 <br /> During the monthly inspection, the designated operator shall review the alarm history for the previous <br /> month, check that each alarm was documented and responded to appropriately, and attach a copy of <br /> the alarm history with documentation taken in response to any alarms to the monthly report. Ensure that <br /> designated operators performing monthly inspections at this facility are including all of the required <br /> information on the reports. <br /> Submit a statement for the explanation of these alarms and include any response action ie. work order <br /> and how to ensure the designated operators are documenting all alarms. <br /> Submit to SJC EHD within 30 days (04/15/13): <br /> 1. one copy of the completed "Return to Compliance Certification" form for 2013 <br /> 2. a written corrective action statement <br /> 5. submit online http://cers.calepa.ca.gov facility's UST reports. contact me if you need assistance <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME EHD'S CURRENT HOURLY RATE. <br /> Inspector_ Recei By: : � Title'. <br /> C' , <br /> EHD 23-02 Rev 04/19/12 Page 3 UST INSPECTION REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.