My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3775
>
2300 - Underground Storage Tank Program
>
PR0231418
>
COMPLIANCE INFO 2012-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:19:01 PM
Creation date
11/8/2018 9:55:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2015
RECORD_ID
PR0231418
PE
2361
FACILITY_ID
FA0003715
FACILITY_NAME
Tracy Blvd Chevron
STREET_NUMBER
3775
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
3775 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TRACY\3775\PR0231418\COMPLIANCE INFO\COMPLIANCE INFO 2012-2015.PDF
QuestysFileName
COMPLIANCE INFO 2012-2015
QuestysRecordDate
10/10/2017 8:57:48 PM
QuestysRecordID
3096410
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit 1 (continued) <br /> Exhibit 1(continued) Component Identification and Location <br /> Phil-Tite Phase I Vapor Recovery System Equipment List <br /> MIF.&Model Mir &Mudcl <br /> Eauioment ManufacturadModel Number <br /> Double FillPhil-Tito (configuration only)(Gas/E85) <br /> Tank Bottom Protector' Phil-Tfte TBP-3516(Gas) <br /> Phll-Tlte TBP-3516-E(Gas/E85) <br /> Table 1 <br /> Components Exem t from Identification Requirements <br /> Component Name I Manufacturer Model Number <br /> OPW 61-T Straight Drop Tube(Gas) <br /> Drop Tube EBW 782-3043X2 GasIE85 <br /> Dust Caps Morrison Brothers 323C-0100ACEVR(vapor)'(Gas) <br /> 305C-0100ACEVR roduct'(Gas) <br /> Ever-Tile 4097 AGER AGMBRNL MBR Gas Phil-Tito Model 85000 and 85000-1 Spill Containers <br /> Veeder-Root 312020-952(cap&adaptor) Gas/E85 <br /> 305XPAIIOOAKEVR(cap and adaptor kit)(GasIE85) <br /> Tank Gauge Port Morrison Brothers 305-0200AAEVR(replacement adaptor)(Gas/E85) <br /> Components 305XP-1100ACEVR(replacement ca Gas/E85 <br /> 90037(In Tank Probe Cap and Adaptor Kit)(Gas) <br /> EBW 90037-E(In Tank Probe Cap and Adaptor Kit) - <br /> GasIE85 <br /> Riser Adaptor Phil-Tile MIF 4X4 GasIE85 <br /> Riser Offset Phil-Tde M-6050 Gas/E85 <br /> Riser Support Phil-Tile M-1600(Gas/E85) Phil-Tfte Model PP-1005-TB <br /> Bracket Product Debris Bucket <br /> Spill Container Lid Phil-Tile 85011 Gas/E85 <br /> Sump/Sump Lids Varies Varies GasIE85 y <br /> Morrison Brolhers oust caps identified as 323C EVR and 305C EVR respectively. <br /> The components in Table 2 may not be installed as a new or replacement part on or after <br /> September 1,2002. These components,if installed prior to September 1,2002,may be <br /> used for the remainder of their useful Ige. <br /> Table 2 <br /> Component NameManufacturer Model Number <br /> Drop Tube EBW 782-204 various lengths) Gas <br /> Emco Wheaton A0020 various len ths Gas Phil-Tfte Model PP-1005-TBP VI <br /> Vapor Debris Bucket <br /> If these cornponents are installed or required by regulations of other agencies,only those components and <br /> model numbers specified above shall be installed or used. <br /> Executive Order VR-101-L.FES Phil-Tito Phase I Vapor Recovery System,Exhibit 1, Page 4 Executive Order VR-101-L FFS Phil-Tire Phase I Vapor Recovery System,Exhibit 1, Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.