Laserfiche WebLink
Figure 2E Figure 2F <br /> Typical Phil-Tite Model M-6050 Vapor Recovery Riser Offset <br /> Typical Phil-Tite Sump Configuration <br /> Offset Using Straight Poser Offset Using Ball Float <br /> r <br /> `�.• lOFFUT <br /> O •:'Y 2� �1 To Eww20 lneix. <br /> WER `Y �� 0rr5R <br /> �rma• <br /> reAYF <br /> ]/9 log <br /> 17 5A, <br /> ll„wM <br /> d1. N. <br /> IYPcx) <br /> PM-TI.Y \` I RM1l-liY Y tlM \ <br /> IIn.Nd AdM <br /> gw qe,� EKY«Iw a.In <br /> ♦LL SIDE VAPOR SIDE a <br /> mlq mo <br /> VOW <br /> 55000-E%T FILL Mxr 2MwGW EOw <br /> Pnn-➢I. nim, 1 <br /> qan PbMprm ,.._..._,._. mnerw wprY <br /> vaW R«.w nllnq <br /> 15001-YV-ExT VAPOR tun w�a.«pv m10 <br /> Fit,III.., Wi rwm <br /> sump R.aucw vmt Id. <br /> ,;r <br /> Note: This figure represents one instance where a vapor recovery riser has been offset in <br /> order to construct a two-point Phase I vapor recovery system. The above figure illustrates an <br /> offset using a 90-degree elbow. However,in some instances,elbows less than 90 degrees <br /> may be used. All fittings and pipe nipples shall be 4-inch diameter similar to those of the spill <br /> container and rotatable Phase I adaptors in order to reduce back pressure during a gasoline <br /> delivery. <br /> Executive Order VR-101-L,FFS Phil-Tice Phase I Vapor Recovery System,Exhibit 2. Page 10 E.e live Omer VR-101-L,FFS Phil-Tice Phase I Vapor Recovery System,Exhibit 2, Page 11 <br />