Laserfiche WebLink
EQIP <br /> Underground <br /> storage Irank <br /> Service Station Hardware Equipment <br /> • • , 7n2 <br /> 708-491-01* Dual point Outside of valve body Th16/40.64 96/243.84 172/436.88 <br /> 708-491-02* Dual point Outride of valve body Th16/40.64 120/304.8 196!497.84 <br /> Attached708-491-11*** Dual Point Factoryinstalled Thtotoptube 96/243.84 172/436.9 <br /> Attached <br /> 708-491-12*** Dual Point Factory installed Threaon to top tube 120/304.8 196/497.8 <br /> 708-491-21** Dual Point Outside of valve body Thread on 60/152 16/40.64 96/243.89 172/436.88 <br /> 708-492-01* Dual point Outside of valve body Thread on 120/304.8 16/40.64 96/243.84 232/589.28 <br /> 708-492-02* Dual point Outside of valve body Thread on 120/304.8 16/40.64 120/304:8 256/650.24 <br /> Attached <br /> 708-492-11*** Dual point Factory installed Thread on 120/304.8 to top tube 96/243.84 2161548.6 <br /> Attached <br /> 708-492-12*** Dual point Factory installed Thread on 120/304.8 totoptube 120/304.8 240/609.6 <br /> 708-493-01 Coaxial Inside of valve body Thread on 60/152.4 16/40.64 96/243.84 172/436.88 <br /> 708-493-02 Coaxial Inside of valve body Thread on 60/152.4 16/40.64 120/304.8 1961497.84 <br /> Dual point <br /> 708-494-04 Valve/Adaptor Kit Outside of valve body Rivet on N/A 16/40.64 N/A N/A <br /> *ULC Approved <br /> Note:Drop tube height can be adjusted in the field. <br /> * ULC MH21090 <br /> **Biofuel Approved(E85 and Biodiesel) <br /> ***EVR Phase 1 Certification,-11 <br /> and-12 models VR-101 <br /> Top of riser <br /> A Riser pipe <br /> Top of tank <br /> 95% <br /> B <br /> U.S.T. <br /> LaiC <br /> Bottom of tank <br /> 6-standard spacing or per local code <br /> 9 <br />