My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2012-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3775
>
2300 - Underground Storage Tank Program
>
PR0231418
>
COMPLIANCE INFO 2012-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:19:01 PM
Creation date
11/8/2018 9:55:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2015
RECORD_ID
PR0231418
PE
2361
FACILITY_ID
FA0003715
FACILITY_NAME
Tracy Blvd Chevron
STREET_NUMBER
3775
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
3775 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TRACY\3775\PR0231418\COMPLIANCE INFO\COMPLIANCE INFO 2012-2015.PDF
QuestysFileName
COMPLIANCE INFO 2012-2015
QuestysRecordDate
10/10/2017 8:57:48 PM
QuestysRecordID
3096410
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ip <br /> 1% " SAN JOAQUIN COUNTYENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, CA 95202-3029 <br /> Telephone: (209) 468-3420 Fax: (209) 468-3433 Web:www.sigoy.orQ/ehd <br /> UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br /> Facil' Name: I Inspection Date: <br /> Facility Address: Seri Request#: <br /> VA3 <br /> Onsite Service Technician's Name: ICr Service Technician/Installer Exp.Date: Manufacturer Training: <br /> -30 1003 <br /> ER E SE ICE <br /> Leak detector Spill bucket ❑ minimum 5 gallon <br /> El L1 <br /> mechanical Model: ❑ 1-] 1 hour hydrostatic ❑ Incon TS-STS <br /> L1 electronic Serial#: <br /> 71 line test programmed ❑ Caldwell System ❑ Other <br /> Leak detector Spill bucket El minimum 5 gallon <br /> ❑ El mechanical Model: El ❑ 1 hour hydrostatic ❑ Incon TS-STS <br /> 71 electronic Serial#: <br /> ❑ line test programmed ❑ Caldwell System ❑ Other <br /> sensor <br /> El ❑ positive shutdown Model: Primary piping testing at: <br /> El❑ fail safe Serial#: psi <br /> ❑ NA minutes <br /> sensor Secondary containment testing for: <br /> ❑ ❑ positive shutdown Model: UDC(s) Piping <br /> ❑ fail safe Serial#: Sump(s) UST(s) <br /> ❑ NA <br /> sensor ❑ Testing for the above components are next due by: <br /> ❑ ❑ positive shutdown Model: <br /> ❑ fail safe Serial#: Note Please be aware that 2°containment components are required to be tested upon <br /> ElNA installation,6 months after,and every 36 months thereafter. <br /> ❑ Drop tube with mechanical overfill at 95% ❑ Cold start of monitoring panel <br /> ❑ Drop tube with mechanical overfill at 95% ❑ Corrosion protection <br /> ❑ Overfill prevention (see LG letter 150-1) Other: see below <br /> This UST facility is APPROVED to operate ❑ This UST facility is NOT APPROVED to operate <br /> Ori <br /> _ IZJIF4 _ <br /> P 5s-f <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Inspecto Received By: / Title: <br /> EHD 23-04 UST SERVICE REQUEST INSPECTION REPORT <br /> Rev 10/06/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.