Laserfiche WebLink
D.Results of Testing/Servicing <br /> Software version Installed: 123.01 <br /> Complete the following checklist: <br /> IT yes Wthat <br /> s the audible alarm operational? <br /> r yes the visual alarm operational? <br /> r yes ere all sensors visually inspected,functionally tested,and confirmed operational? <br /> r yes ere all Is, <br /> installed at lowest point of secondary containment and positioned so that other equipment will not interfere wilt <br /> eir ro r o eration? <br /> IT Yes alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> r yes or pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring <br /> stem detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive shut-down?(Check <br /> ll that apply)r Sump/Trench Sensors; P Dispenser Containment Sensors. <br /> id you confirm positive shut-down due to leaks and sensor failure/disconnection?C• Yes; r No <br /> IT yes r" Noa For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no mechanical overfill <br /> r" N/A prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly?If <br /> so at what Rercent of tank capacity does the alarm trigger?90% <br /> r Yes* r No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all re lacemen[parts in Section E below, <br /> r yes* C• No Was liquid found inside any secondary containment systems designed as dry systems?(Check all at apply) <br /> Product r Water.If yes,describe causes in Section E below. <br /> IT yes r No- Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> r Yes r No' Is all monitoring equipment operational per manufacturers specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E.Comments: <br /> ATG,208 SENSORS ALL PASS. <br /> Monitoring System Certification Page 2 of 3 12/07 <br />