Laserfiche WebLink
-- RECEIVED <br /> SWRCB,January 2002 FEB 27PNi4ofl <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes r L <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested r HEALTH DEPARTMEN <br /> Test Method Developed By: r Spill Bucket Manufacturer r-: Industry Standard r Professional Engineer <br /> Other(Specify): <br /> Test Method Used By: r Pressure rv—,,' Vacuum r Hydrostatic <br /> r— Other(Specify): <br /> Test Equipment Used:VACUUM TEST Equipment Resolution:0.1 gph <br /> Spill Box#Tank T I Spill Box It Tank T2 Spill Box#Tank T3 <br /> SUPREME-Fill l- PLUS-Fill 1-Direct- REGULAR-Fill l- Spill Box# <br /> Direct-Grade level Grade level Direct-Grade level <br /> Bucket Diameter: 11.50 I L50 11.50 <br /> Bucket Depth: 12.50 12.50 12.50 <br /> Wait time between applying <br /> pressure/vacuum/water and 1 min I min 1 min min <br /> startin test <br /> West Start Time: 10:46:00 10:47:00 10:51:00 <br /> Initial Reading(RI): 30.00 in.H2O 30.00 in.H2O 30.00 in.H2O <br /> Test End Time: 10:47:00 10:48:00 10:52:00 <br /> Final Reading(RF): 30.00 in.H2O 29.00 in.H2O 30.00 in.1120 <br /> Test Duration: I min I min 1 min <br /> (RF-Rj): 0.00 in.H2O -1.00 in.H2O 0.00 in.H2O <br /> Pass/Fail Threshold or Criteria: +/-4.00 +/-4.00 +/-4.00 +/- <br /> Test Result: Pass Pass Pass <br /> Comments-(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> WO:2315868 <br />