Laserfiche WebLink
S. a. Describe the method that will be utilized to purge a d/or inert the tank(s): <br /> b. Tank/Piping Hauler. <br /> Name S A41, <br /> /� <br /> Address'7� /�, Cil W-.4) Zip <br /> Phone No. ef—'F3 <br /> Hauler Registration # (if hauled as hazardous) <br /> C. Tank/Piping Disposal Site: <br /> Nam ,,//� yy���� <br /> Addressa6,L7 A(I� 1/ ' Ci Zip <br /> Phone No.( 'Z-6q <br /> RPA II)# (if transported to a permitted TSD facility) <br /> 9. Describe, in detail, how the soil and/or water sample(s) beneath the tank and piping will be obtained: <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal: <br /> Joy— a�hx fl i6c c <br /> 11. Handling of excavated soil: <br /> a) What material will be used to line the tank pit and cover the stockpile? <br /> �(5QU&3& L AQ Qw 1 P /Lkc�( � <br /> b) What will be the final destination of the excavated stockpile? <br /> l Tz o f 23 e t-- x OL c <br /> c) Contaminated Soil Hazardous Waste Hauler: <br /> NameHauler Registration #n� <br /> AddressZ'5'5- VI) Cityl 'yIO Zip <br /> Phone No. /d z3 5���3 93 <br /> Page 5 <br />