My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
560
>
2300 - Underground Storage Tank Program
>
PR0231421
>
COMPLIANCE INFO 1986-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:39:24 PM
Creation date
11/8/2018 9:55:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2007
RECORD_ID
PR0231421
PE
2381
FACILITY_ID
FA0003502
FACILITY_NAME
TRACY CITY PUBLIC WORKS
STREET_NUMBER
560
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23515006
CURRENT_STATUS
02
SITE_LOCATION
560 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TRACY\560\PR0231421\COMPLIANCE INFO 1986-2007.PDF
QuestysFileName
COMPLIANCE INFO 1986-2007
QuestysRecordDate
8/18/2017 3:15:11 PM
QuestysRecordID
3590253
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICATE <br /> Protect Location iv(- c ;` --lvCI r <br /> er =TC'r11y 4`' (_ Phone No. ;�7eq_t� .�i•� j�G <br /> Contractor'- l'. 1 ri . Y-GC Cer..J�.Phone No.Ze j-(/ �/- j i 3 License No. <br /> INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br /> 1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br /> 2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials <br /> was placed in the excavation in 12" lifts: <br /> A. Pea gravel--smooth, rounded material not more than one-half (1/2) inch in diameter <br /> B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br /> measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between <br /> the backfill material and tanks/pipes made of poly resin glass or similar materials.) <br /> DECLARATION <br /> I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of roject completion,or submission <br /> of verification that the select material described above will be placed at a minimum of true (5 cubic yards per 1000 gallon tank <br /> displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building <br /> Code Appendix Chapter 70. <br /> e not <br /> tg to "re <br /> Shall be the responsible managing employee on the license or authorized agent. <br /> r � <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.