Laserfiche WebLink
WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING-P40GRAM <br /> This monitoring program must be kept at the UST location at all times. The informationoz} its monitoring <br /> program are conditions of the operating permit The permit holder must notify San Joaquin County <br /> Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br /> procedures, unless required to obtain approval before making the change. <br /> Required by Sections 2632(d) and 2641(h) CCR <br /> Facility Name ci r; of Tracy Boyd Service Center <br /> Facility Address 520 Tracy Blvd. Tracy, CA 95376 <br /> A. Describe the frequency of performing the monitoring: <br /> Tank All tanks are monitored daily and teste at least once per day. <br /> 1Yiping All nin 'ng Jq monitored andtested a^'ly. Any possible leaks detected <br /> system shuts off. _ <br /> B. What methods and equipment, identified by name and model, will be used for <br /> performing the monitoring: <br /> Tank 'n tnak 'nye rte, T_ ,._t. r,...t. «....« tern Veeder Root TLS—�50 <br /> Monitoring system - - <br /> Piping Tine leak test CSLD Pressure line test line leak detect, <br /> vapor status Veeder Root TLS-350 monitoring system. <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan <br /> should be attached): <br /> Boyd Service Center, 520 Tracy Blvd Trace CA 95376 <br /> D. List the name(s) and title(s) of the people responsible for performing the monitoring <br /> and/or maintaining the equipment: <br /> William R. Watkins, Senior Equipment Mechanic <br /> E. Reporting format for monitoring: <br /> Tank <br /> Piping <br /> F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule <br /> but not less than every 12 months: Technician approved by manufacturer will <br /> inc¢p t Ry tem nn a p r r and pp, f rm all neressary maintananraair <br /> manufacturers recommended procedures. <br /> G. Describe the training necessary for the operation of UST system, including piping, <br /> and the monitoring equipment: Installer provided all training for operation <br /> of equipment Comnlprp manuals provided and on-site personnel to train any <br /> otherpersonnel on equipment as required. <br />