My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2017 INSTALL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10715
>
2300 - Underground Storage Tank Program
>
PR0541281
>
INSTALL 2017 INSTALL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2023 4:14:46 PM
Creation date
11/8/2018 9:55:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2017 INSTALL
RECORD_ID
PR0541281
PE
2361
FACILITY_ID
FA0023650
FACILITY_NAME
Trinity Parkway AMPM ARCO #83819
STREET_NUMBER
10715
STREET_NAME
TRINITY
STREET_TYPE
Pkwy
City
Stockton
Zip
95219
APN
6602002
CURRENT_STATUS
01
SITE_LOCATION
10715 Trinity Pkwy
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TRINITY\10715\PR0541281\2017 INSTALL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
339
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dual structural <br />support sleeves <br />for Rack System <br />Positive <br />concrete <br />anchoring <br />Rigid Celcon compression <br />type above ground fittings <br />for 2" piping are UV and <br />weather resistant <br />Planter style <br />epoxy steel <br />access cover <br />with lock tabs <br />*k <br />Fluid reservoir <br />for visual inspection <br />& electronic sensor <br />(SENSOR NOT INCLUDED) <br />Epoxy coated <br />steel midframe <br />available with <br />galvanized or <br />stainless options -- <br />Recommended: <br />F-Series-D all FRP <br />permanent entry fittings Interstitial <br />fluid included <br />Options for <br />Structural <br />Anchoring of <br />Veeder CCVP <br />(California) <br />All sumps ship <br />with a combo <br />gauge Installed <br />& under 20"Hg <br />vacuum or more <br />for continuous monitoring <br />Recommended: <br />Electrical Offset - EO <br />Eliminate conduit <br />entry fittings <br />Recommended: <br />Bravo Rack System <br />Part # RS-500 <br />Contact <br />factory <br />for more <br />information <br />DOUBLEWALL TRANSITION CONTAINMENT <br />B-500-D-AB TRANSITION SUMP - PLANTER STYLE <br />MANUFACTURED OF FIBERGLASS <br />FOR HYDROSTATIC OR VACUUM MONITORING <br />"MOO Optional rigid <br />penetration fitting <br />for 3" diameter <br />piping. 1-1/2" option <br />also available. <br />Third Party Approved <br />AB-2481 Compliant <br />21M1411 <br />LISTED <br />Patented 6,823,886 <br />Other Patents Pending <br />S. Bravo Systems. Inc. - The Leader in Secondary Containment ()pH <br />MEMBER <br />2929 Vail Ave. I Commerce, CA 323-888-4133 FAX: 323-888-4123 www.sbravo.com 11A
The URL can be used to link to this page
Your browser does not support the video tag.