9. You need to illustrate striker plates below all accessible openings of the tanks. <br /> 10. Please submit evidence of training, by a certificate of training issued by the tank and piping <br /> manufacturers, for the employees who will be installing the tanks and piping. <br /> i 1. On the service request form you have identified Ali Ahmad as the billing party. On page four <br /> of the application you have identified Elite IV as the responsible billing party. Which is the <br /> correct billing party who will be responsible for additional PHS-EHD staff time if necessary. <br /> 12. You need to submit three sets of the application. Please make the necessary changes to the <br /> one enclosed so it is consistent with the specification sheets and the blue prints, and return <br /> three copies of it to this office. <br /> 13. Please submit an illustration of the detail below the dispensers including the product piping, <br /> dispenser containment, flex boot connectors etc. <br /> 14. Will the EBW LS3-A probe be used in the piping sumps and annular space? If yes, you need <br /> to identify the model number of this probe on page six of the application. <br /> REMOVAL <br /> 1. I have returned the application you submitted. Please make the necessary changes and <br /> return three sets of the corrected application to this office. <br /> 2. You need to state in writing that U.S.A. dig will be notified prior to excavating. <br /> 3. You need to identify the EPA I.D. number on page three of the application. <br /> 4. The owner/operator must sign page nine, "Authorization to release'. <br /> 5. You need to complete all applicable portions of page ten. <br /> 6. On page five of the application you have identified that the tank and piping will be hauled as <br /> hazardous. Is this true? <br /> 7. You have indicated on page five that if contaminated soil is encountered at this site it is not <br /> within the scope of your contract to remove it. All soil generated from the removal of the <br /> existing underground storage tanks and piping shall remain onsite until it can be shown not to <br /> be a hazardous waste. <br /> 8. You have identified Byron Power Plant as the permitted treatment storage & disposal facility <br /> for the rinsate. You need to choose a facility permitted by the Califomia Department of Toxic <br /> Substances Control. Please identify a permitted facility. <br /> If you have any questions regarding this matter I can be reached at(209)468-0333. <br /> Thank you for ur cooperation, <br /> inc Trevena, Senior R.E.H.S. <br />