Laserfiche WebLink
`*6ITE SPECIFIC SAFETY PLAN <br /> INTRODUCTION <br /> This document describes the health and safety procedures for the <br /> activities planned in nPrforming a preliminary site investigation at <br /> All personnel and <br /> subcontractors will follow this plan. The prime responsibility for <br /> employee safety lies with each company that is involved in the work <br /> for it's own employees . It is expressly intended that all project <br /> work will comply with applicable sections of the California <br /> occupational Health and safety code. All parties working on this <br /> project will maintain a general responsibility to identify and <br /> correct any health and safety hazards and are responsible for working <br /> in a safe manner. <br /> Rey Personnel <br /> Project personnel who will have overall responsibility for the safe <br /> operation of this are: <br /> Site Contact: <br /> Project manager and <br /> Site safety Officer: <br /> Elite IV_ Contractors (209) 461 6337 <br /> fax 461 6342 <br /> Project Manager and Safety Officer Responsibilities : <br /> * To conduct initial site safety training for all project <br /> field team members as described in this document, <br /> * To assure all field team personnel have read and <br /> understand the Health and Safety Plan, <br /> * To assure that all work performed on this project is <br /> conducted in a safe manner, <br /> * To coordinate with field personnel fire-watch, traffic <br /> control and site security, <br /> SITE S+,FM PLM (SSP) - 1 <br />