Laserfiche WebLink
m+km �S ITT <br /> Integrity Tank Testing Systems, Inc, <br /> � i - <br /> OCT 1 1 1988 <br /> ENVIRONMENTAL <br /> LTH <br /> PERMIT I SERVICES <br /> September 26, 1988 <br /> TEST DATA & RESULTS <br /> GENERAL MILLS, INC. <br /> 2000 West Turner Road <br /> Lodi, California 95240 <br /> The following is a summary of the precision testing we recently <br /> conducted on your underground storage tank (s) . <br /> Enclosed are copies of the test worksheets and graphs <br /> during the testing. They are generated <br /> provided for your submittal to the <br /> appropriate govenmental agency. <br /> A tank system is considered tight, according to the current <br /> regulations, if the gain is less than .02 or the loss is less than .05 <br /> gallons per one hour of testing. If the results shown below are <br /> beyond these parameters, you will need to take remedial action. <br /> Please note page 2 of this letter if a no is shown in the final column <br /> below, <br /> TANK ## / TANK PRODUCT TEST WITHIN "TIGHT" <br /> LOCATION CAPACITY CONTAINED RESULTS TANK PARAMETERS <br /> Center 12, 000 #5 Diesel - . 14207 <br /> InecncZusive <br /> Please contact us if you need additional assistance or <br /> information. <br /> Sincerely, <br /> Frank reser <br /> Certified Tester <br /> 800 262-8378 166 Frank West Circle Stockton, CA 95206 <br /> (209) 466-8036 ' <br />