Laserfiche WebLink
Monitoring System Certification <br /> Site Address 2500 West Turner Rd. Date of Testin Scrvicin 4 25 12 <br /> F.In-Tank Gauging/ SIR Equipment: 91 Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring, <br /> Complete the following checklist: - <br /> ® Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> N Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> a Yes ❑ No* Was accuracy of system product level readings tested? <br /> U Yes ❑ NO Was accuracy of system water level readings tested? <br /> U Yes ❑ No* Were all probes reinstalled properly? <br /> CI Yes ❑ No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors (LLD): U Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all than apply) Simulated leak rate. ❑3 g.p.h; ❑0.1 g.p.h, ❑0.2 g.p.h. <br /> ❑ Yes ❑ No* Were all LLDs confmned operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ NIA <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> ❑ N/A disconnected? <br /> ❑ Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ N/A or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ❑.Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> There are two turbines on tank to feed day tank. <br /> Page 3 of 3 03lm <br />