My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
2500
>
2300 - Underground Storage Tank Program
>
PR0232507
>
COMPLIANCE INFO 2007 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 12:00:24 PM
Creation date
11/8/2018 9:56:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007 - 2015
RECORD_ID
PR0232507
PE
2361
FACILITY_ID
FA0003846
FACILITY_NAME
Verizon Business: LDIKCA
STREET_NUMBER
2500
Direction
W
STREET_NAME
TURNER
STREET_TYPE
Rd
City
Lodi
Zip
95242
APN
029-030-39
CURRENT_STATUS
01
SITE_LOCATION
2500 W Turner Rd
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\T\TURNER\2500\PR0232507\COMPLIANCE INFO 2007 - 2015.pdf
QuestysFileName
COMPLIANCE INFO 2007 - 2015
QuestysRecordDate
9/9/2016 5:33:19 PM
QuestysRecordID
3186119
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, California 95202-3D29 <br /> Telephone: (209)468-3420 Fax:(209) 468-3433 Web:www.sogov.org/ehd/unitiii.html <br /> UNDERGROUND STORAGE TANK (UST) PROGRAM INSPECTION REPORT CONTINUED <br /> Facility FacMCI, Verizon Addresitys: <br /> 2500 W. Turner Rd. Lodi CA 94242 Inspection A r 25, 2012 <br /> Name: Address: Date: p <br /> VIOLATIONS <br /> # C1 All Code Section HSC=CA Health and SafelyCode;CFR=Code of Federal Regulations <br /> C2 <br /> C1=Class 1 violation;C2=Class 2 violation;M=Minor violation <br /> Non-Pressurized Piping(continued) <br /> 702 CCR 2643(e) Biennial tightness test of gravity piping not performed(pre-January 1, 1984) iMi) <br /> 703 CCR 2643(d) Triennial line test for conventional suction piping not performed(pre-January 1,1984) (Mti <br /> Other Violations <br /> 999 1 j0ther: See attached"Continuation—Official Inspection Report"for violation(s)not listed above. <br /> SUMMARY OF VIOLATIONS <br /> CLASS I,CLASS II or MINOR-Notice to Comply) <br /> On site to conduct a routine inspection. <br /> 113. A new designated operator, Philip De Forge was hired on 2-16-12 and notification was not provided <br /> to the EHD within 30 days of the change. Any changes shall be reported to the EHD within 30 days. <br /> Submit notification to the EHD identifying all the designated operators for this facility by 5-25-12. During <br /> the inspection, Paul Perotti provided a current copy of the owner designated operator statement. <br /> Corrected on site. <br /> 204. The designated operator failed to check and note the correct test dates for the line test on the May <br /> 2011 through April 2012 designated operator monthly inspection reports. The designated operator <br /> reports from May 2011 through January 2012 listed the annual line test as 5-17-10. It should have been <br /> listed as 4-29-11. The designated operator reports February 2012 through April 2012 list the line test as <br /> not applicable and left the date blank. During the monthly inspection, the designated operator shall <br /> check that all required testing and maintenance for the UST system have been completed and document <br /> the dates they were done. Ensure that designated operators performing monthly inspections at this <br /> facility are including all of the required information on the reports. <br /> The EHD will not accept the monitoring system certification testing performed at 9:00 AM on 4-25-12. <br /> The EHD received a notification on 2-22-12 that the monitoring system certification and spill container <br /> testing would be performed at 1:00 PM. The EHD inspector was not able to witness the testing nor <br /> conduct a complete inspection. A 48 hour notification must be provided to the EHD for a properly <br /> licensed, trained, and certified contractor to perform the monitoring system certification testing which can <br /> be witnessed by the EHD inspector. The monitoring system certification, spill continer, and annual <br /> product line integrity test is due before May 2012, otherwise it will be considered late and additional <br /> violations will apply. <br /> A reinspection will be billed at the EHD's current hourly rate. <br /> Complete and submit a copy of the Return to Compliance Certification form with a statement of how <br /> each violation was corrected, including supporting documentation, by 5-25-12. <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. <br /> T TY is ECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> I I it X4 Al <br /> In _� By Tilla <br /> EHO 23-02 Rev OglOV71 1LJ�� ^f 1`'n`Page 3 '/'/� UST INSPECTION REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.