Laserfiche WebLink
J <br /> Underground Storage Tank Monitoring Plan--Page 2 of 2 <br /> MONITORING OF AREAS BEN$ATH pISPENSER(S)IS PERFORMED U O p�OQ MING G HODS) (Call that"" <br /> ,.. ; <br /> El I.CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(UDC) apply) Ksa <br /> PANEL MANUFACTURER: <br /> LEAK SENSOR MANUFACTURMODEL#: <br /> Mss'ER: �, <br /> M33' #(S): . <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGMODELER AUDIBLE AND VISUAL ALARMS? <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b..NO Mss- <br /> WILL FAILUREID;SCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a YES ❑ b'NO :. <br /> ❑ 2.MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK ❑ a YES ❑ b.NO <br /> ASSEMBLY MANUFACTURER: Msa. <br /> ❑ 3}7SUAL MONITORING DONE: ❑ a.DAILY MODEL q(S): ttsy, <br /> �/ ❑ b.WEEKLY(t4quires.au,�y appm+t} <br /> A/4.NO DISPENSERS <br /> ❑ 99.OTHER(Specify) <br /> ❑ 1.WE HA VE BEEN NOTIFIED BY 7IiE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENI IANCED LFAK M70- <br /> � DETECTION(ELp)FOR THE UST(S)COVERED BY THIS PLAN PF.R 23 CCR§2644.1,ELD IS PERFORMED£VERY 36 MONTHS AS REQUIRED <br /> RE CE DOCl7MENTS MAIN AWED AT FACILITY(Check at[that apply) <br /> I. S UNDERGROUND STORAGE TANK MONITORING PLAN(Required) MHO <br /> 2. �PERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> 3. FACILITY'S BEST MANAGEMENT PRACTICES(Required as of January 1,2005) <br /> 4. CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. SPATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7. ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> 99.❑ OTHER(Specify): <br /> Personnel with UST monitoring responsibilities ace familiar with all of the above documents relevant to their job duties and can access those documents when needed.t <br /> By January 1,2005,this facility will have a"Designated UST Operator"who has passed the California UST Sytem Operator Exam administered by the International <br /> Code Council(ICC). By July I.2005,and annually thereafter,the "Designated USF Operator"will train facility employees in the proper operation and maintenance <br /> of the UST systems.This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best <br /> ➢ The facility employee's role with regard to the leak detection equipment. management practices. <br /> D The facility employee's role with regard to spills and overfills. <br /> D Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after July 1,2005,the initial training will be conducted within 30 days of the date of hire. <br /> IX, COMMENTSIADDYT ONAL INFORMATION <br /> Please use this section to include any additionat UST system monitoring-related information(e.g.,additional information required by your local agency): Mes. <br /> Note regarding Section X.Pending certification of a Designated UST Operator,the following person has authority for performing the monitoring <br /> activities and maintaining leak detection equipment Covered by this plan. NAME: JOB TITLE: <br /> [b <br /> 'APPLICATION X. PEKSONNI� ESP.ONSIBILITIES <br /> AS OF JANUARY 1, 2005, THE "DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT <br /> TION—FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING <br /> LEAK DETECTION EQUIPMENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS <br /> OF THE FACILITY'S UST SYSTEMS 1N ACCORDANCE WITH 23 CCR§2715(b). <br /> r c: <br /> Al .ONVNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. " <br /> OWNERIOPERATOR SIGNATURE n I2ESENTIN DATE: _ Niue. <br /> cJ l�w w�- �"wner M9o. `�C v <br /> rQ0 razor J J Ip <br /> OWNERIOPERATOR NAME(print): t M92- OWNER/OPERATOR TITLE: <br /> ���� r[arty W tib efn :yn E+�v __TCrx,. <br /> (Agency Use Only) This plan has been reviewed and Approved L]Approved With Conditions ❑Disapproved <br /> Local Agency Signature: Date: 0 <br /> Comments/Special Conditions: <br /> UN-022A-315 www.unidocs.org Rev.10/14/03 <br />